CEA (1982). Customer Damage Resulting from Electric Service Interruptions, Volume 1. Canadian Electrical Association.
2.
ChaoH. P. (1983). “Peak Load Pricing and Capacity Planning with Demand and Supply Uncertainty.” Bell Journal of Economics13(1): pp. 249-253.
3.
ChaoH. P.WilsonR.. (1986). “Optimal Pricing and Investment of Priority Service,” in Priority Service: Unbundlingthe Quality Attributes of Electric Power Report EA-4851. Palo Alto, CA: Electric Research Institute.
4.
CummingsR. G.BrookshireD. S.SchulzeW. D. (eds). (1986). Valuing Environment Goods: An Assessment of the Contingent Valuation Method. Towota, New Jersey: Rowman and Allenheld.
5.
DubinJ. A.McFadden. (1984). “An Economic Analysis of Residential Electric Appliance Holdings and Consumption.” Econometrica52: pp. 345-362.
6.
EPRI. (1986). The Value of Service Reliability to Consumers, EA-4494.
7.
FreemanA M. III. (1979). The Benefits of Environmental Improvement Theory and Practice. Baltimore: Johns Hopkins University Press.
8.
FreemanA. M. III. (1982). Air and Water Pollution Control: A Benefit-Cost AssessmentNew York: John Wiley and Sons.
9.
GreeneW. H. (1981). “On the Asymptotic Bias of the Ordinary Least Squares Estimator of the Tobit Model.” Econometrica49(2): pp.505-512.
10.
HartmanR. S. (1986). “The Dangers of Self-Selection Bias in Program Evaluation: Measuring the Effects of Voluntary Energy Conservation Programs.” Boston University and the Analysis Group, Inc. Working Paper.
11.
HartmanR. S.DoaneM. J.. (1986). “The Estimation of the Effects of Utility-Sponsored Conservation Programmes.” Applied Economics18(1): pp.1-25.
12.
HeckmanJ. (1979). “Sample Selection Bias as a Specification Error.” Econometrica47: pp. 153-161.
JohnsonP. D.KotzS.. (1972). Distributions in Statistics: Continuous Multivariate Distributions. New York: Wiley.
15.
KahnemanD.TverskyA. (1979). “Prospect Theory: An Analysis of Decision Under Risk.” Econometrica47: pp. 263-91.
16.
MaddalaG. S. (1983). Limited-Dependent and Qualitative Variables. Cambridge: Cambridge University Press.
17.
MunasingheM. (1979). The Economics of Power System Reliability. Baltimore: Johns Hopkins University.
18.
MunasingheM. (1980). “Cost Incurred by Residential Electricity Consumers due to Power Failures.” Journal of Consumer Research6: pp. 361-369.
19.
Ontario Hydro. (1980). Ontario Hydro Surveys on Power System Reliability: Summary of Customer Viewpoints. Ontario Hydro Report RO & MR 80-12.
20.
RAI. (1985). Value of Service Customer Survey. Bryn Mawn Robinson Associates, Inc.
21.
RoweR. D.d’ArgeR. C.BrookshireD. S.. (1981). “An Experiment on the Economic Value of Visibility.” Journal of Environmental Economics and Management7(1): pp. 1-19.
22.
SchulzeW. D.d’ArgeR. C.BrookshireD. S.. (1981). “Valuing Environmental Commodities: Some Recent Experiments.” Land Economics (May).
23.
TobinJ. (1958). “Estimation of Relationships for Limited Dependent Variables.” Econometrica26: pp. 24-36.
24.
WooC. K. (1987). “Air Conditioner Load Model.” The Energy Journal: Proceedings of the IAEE 8th American Conference.
25.
WooC. K.ToyamaN.. (1986). “Service Reliability and the Optimal Interruptible Rate Option in Residential Electricity Pricing.” The Energy Journal7(3): pp. 123-126.