AnderssonR.TaylorL. (1986). “The Social Cost of Unsupplied Electricity - A Critical Review,” Energy Economics (July): pp. 139-146.
2.
BentalB.RavidS. (1986). “A Simple Method for Evaluating the Marginal Cost of Unsupplied Electricity,” The Bell Journal of Economics, 13: pp. 249-253.
3.
BrownG.JohnsonM. (1969). “Public Utility Pricing and Output Under Risk,” American Economic Review (March): pp. 119-128.
4.
ChaoH.P.WilsonR. (1987). “Priority Service: Pricing, Investment and Market Organization,” American Economic Review77 (December): pp. 899-916.
5.
CrewM.KleindorferP. (1978). “Reliability and Public Utility Pricing,” American Economic Review (March), pp. 31-40.
6.
CummingsR.G.BrookshireD.S.SchulzW.D. (1986). Valuing Environmental Goods: An Assessment of the Contingent Valuation Method. Totowa, N.J.: Rowman and Allanheld.
7.
Electric Power Research Institute (1981). “Power Shortage Costs: Estimates and Applications,” Report prepared for EPRI by Faucett Associates, EA-1215, California (December).
8.
Electric Power Research Institute (1986). “Value of Service: Scoping Study.” EM-4389, California (January).
9.
Electric Power Research Institute (1989). “Utility Fuel Inventory Model: Version 1-0.” ER-4079-CCM, California (August).
10.
Finnish Power Producers Coordinating Council (STYV) (1979). “Report on the Value of Non-distributed Energy.” Helsinki, Finland (August).
11.
Florida Public Service Commission (1984). “Need Determination for Proposed Lake Tarpon-Kathleen 500 kV Line.” Florida Power Corporation, Docket No. 840044-EI, Order No. 13676. (September13).
12.
HallG.HealyM.PolandW. (1986). “PG&E’s New Methodology for Value Based Generation Reliability Planning.” Paper presented to the System Planning Committee, Edison Electric Institute, Minneapolis (June).
13.
Interconexion Electrica S.A. (1986). “Costos De Racionamiento De Energia Electrica Sectores Industrial, Residencial, Comercio y Servicios Sistema Interconectado Colombiano,” Medellin, Colombia (October).
14.
JaromilloP.SkoknicE. (1973). “Costo Social de las Restricciones Energia Electrica,” Oficina de Planificacion. Chile (August).
15.
MunasingheM. (1979). The Economics of Power System Reliability and Planning, Baltimore: Johns Hopkins University Press.
16.
MunasingheM. (1980). “Costs Incurred by Residential Electricity Consumers Due to Power Failures,” tJournal of Consumer Research6: pp. 361-369.
17.
MunasingheM. (1981). “World Bank Research in Electric Power.” Research News. Washington: The World Bank (Spring): pp. 3-10.
18.
MunasingheM. (1984). “Engineering Economic Analysis of Electric Power Systems,” Proceedings of the IEEE72 (April): pp. 424-461.
19.
MunasingheM. (1987). Rural Electrification for Development: Policy Analysis and Applications. Boulder, Colorado: Westview Press.
20.
MunasingheM.and GellersonM. (1979). “Economic Criteria for Optimizing Power System Reliability,” Bell Journal of Economics (Spring): pp. 353-365.
21.
MunasingheM.Schramm (1983). Energy Economics, Demand Market and Conservation Policy. New York: Van Nostrand Rheinhold.
22.
MunasingheM.WarfordJ. (1982). Electricity Pricing: Theory and Case Studies, Baltimore: Johns Hopkins University Press.
23.
Ontario Hydro (1980). “Survey on Power System Reliability - Summary of Customer Viewpoints.” Report RU80-12. Ontario, Canada.
24.
OrenS.SmithS.WilsonR.ChaoH. (1986). “Priority Service: Unbundling the Quality Attributes of Electric Power.” Electric Power Research Institute, Report No. EPRI EA-4851, Palo Alto, California.
25.
PriestmanD. (1977). “The Cost of a Long Term Electrical Energy Shortage Due to Underplanning.” Paper presented at the Eleventh Annual Pacific Northwest Regional Economic Conference, Eugene, Oregon (May).
26.
SanghviA. (1982). “Economic Costs of Electricity Supply Interruptions: US and Foreign Experience.” Energy Economics4(3): pp. 180-198.
27.
SanghviA. (1983a). “Household Welfare Loss Due to Electricity Supply Disruptions.” The Energy Journal4 (Special Electricity Issue): pp. 33-54.
28.
SanghviA. (1983b). “Optimal Electricity Supply Reliability Using Customer Shortages Costs.” Energy Economics: pp. 129-136.
29.
SanghviA. (1985a). “Optimum Generation Reserve Study.” Final Report to Public Service Commission and Office of the Attorney General of New Mexico.
30.
SanghviA. (1985b). “Survey of Reliability Planning Practices at Major U.S. Utilities.” Report prepared for Pacific Gas and Electric Company of California (October).
31.
SanghviA. (1985c). “Incorporating Risk Preference in Generation Reliability Planning Using the EUE Criterion.” Report prepared for Pacific Gas and Electric Company of California (July).
32.
SanghviA. (1986). “Residential Outage Cost Estimation.” Final report to Rate Department, Pacific Gas and Electric Company (PG&E) of California (December).
33.
ShermanR.VisscherM. (1978). “Second Best Pricing with Stochastic Demand.” American Economic Review68(1): pp. 41-53.
34.
ShipleyR.PettonA.DenisonJ. (1972). “Power Reliability Cost v. Worth,” IEEE Transactions on Power Apparatus and Systems; pp. 2204-2212.
35.
Swedish Association of Electricity Supply Undertakings (1981). “Evaluating Electricity Interruptions.”
36.
Swedish Joint Committee for the Electricity Council (1969). “Cost of Interruptions in Electricity Supply.” Stockholm (September).
37.
TelsonM. (1975). “The Economics of Alternative Levels of Reliability for Electric Generation Systems.” Bell Journal of Economics6(2): pp. 679-694.
38.
ViswanathanN. (1985). “Service-Reliability Differentiated Pricing with Special Reference to Electric Utilities.” Unpublished Doctoral Dissertation, Stanford University, California.
39.
WooC.K.ToyamaN. (1986). “Service Reliability and the Optimal Interruptible Rate Option in Residential Electricity Pricing.” The Energy Journal7(3): pp. 123-136.