AndersonD. (1972). “Models for Determining Least-Cost Investments in Electricity Supply.” The Bell Journal of Economics3 (Spring): pp. 267-301.
2.
Banco Central de Costa Rica (1978a). Production Agropecuaria. San Jose, Costa Rica (July).
3.
Banco Central de Costa Rica (1978b). Cifras de Cuentas Nacionales de Costa Rica, Serie 1957-1977. San Jose, Costa Rica (July).
4.
BoiteuxM. (1949). “La Tarification des Demandes en Pointe.” Revue Generate d’Electricite58.
5.
CrewM.KleindorferP. R. (1979). Public Utility Economics. New York: St. Martin’s Press.
6.
DupuitP. (1932). De L ’Utilite et de sa Mesure. Turin: La Reforma Soziale.
7.
HotellingH. (1938). “The General Welfare in Relation to Problems of Railway and Utility Rates.” Econometrica6: pp. 242-269.
8.
Ministerio de Economia, Industria y Comercio. (1978). Censos Nacionales de 1973 Agropecuruario. San Jose, Costa Rica (July).
9.
MunasingheM. (1979). The Economics of Power System Reliability and Planning. Baltimore: Johns Hopkins University Press.
10.
MunasingheM.GellersonM.. (1979). “Economic Criteria for Optimizing Power System Reliability Levels.” The Bell Journal of Economics10 (Spring): pp. 353-65.
11.
MunasingheM. (1980a). “Integrated National Energy Planning in Developing Countries.” Natural Resources Forum4: pp. 359-73.
12.
MunasingheM. (1980b). “An Integrated Framework for Energy Pricing in Developing Countries.” The Energy Journal1(3): pp. 1-30.
13.
MunasingheM. (1980c). “System Planning to Achieve Optimal Reliability Levels.” Proceedings of the Third International Conference on Analysis. Forecasting and Planning of Public Utilities, INSEAD, Paris (June) pp. 303-24.
14.
MunasingheM. (1980d). “The Costs Incurred by Residential Electricity Consumers Due to Power Failures.” Journal of Consumer Research6 (March): pp. 361-9.
15.
MunasingheM.ScottW. G.Dias-BandaranaikeR.. (1982). “Optimizing Rural Electricity Supply.” Energy Department Report. Washington: The World Bank (August).
16.
MunasingheM.WarfordJ. J. (1982). Electricity Pricing. Baltimore: Johns Hopkins University Press.
17.
MunasingheM. (1986). “Practical Application of Integrated National Energy Planning Using Microcomputers.” Natural Resources Forum (February) pp. 17-38.
18.
RugglesN. (1949-50a). “The Welfare Basis of the Marginal Cost Pricing Principle.” Review of Economic Studies17: pp. 29-46.
19.
RugglesN. (1949-50b). “Recent Developments in the Theory of Marginal Cost Pricing.” Review of Economic Studies17: pp. 107-26.
20.
SanghviA. (1983). “Optimal Electric Supply Reliability Using Customer Shortage Costs.” Energy Economics5 (April).
21.
SteinerP. (1957). “Peak Loads and Efficient Pricing.” Quarterly Journal of Economics, 7(November): pp. 585-610.
22.
SullivanR. (1977). Power System Planning. New York: McGraw-Hill.
23.
TurveyR.AndersonD.. (1977). Electricity Economics. Baltimore: Johns Hopkins University Press.
24.
WilliamsonO.E. (1966). “Peak Load Pricing and Optimal Capacity Under Indivisibility Constraints.” The American Economic Review56: pp. 810-827.