FranconyM. (1981). “Marginal Cost Pricing: Updating the French Electricity Tariffs to Reflect Changes in the Supply-Demand System,” 13th Annual Meeting of the Institute of Utilities. Williamsburg.
2.
LedererP. (1984). Chapter 7: “Generation System and Reliability” in Expansion Planning for Electrical Generating Systems: A Guide Book. Vienna: AIEA.
3.
MoynetG. (1978). “Determination du niveau optimal de puissance du pare du production face àla demande d’électricité,” Revue de I’Énergie (February).