Assessing the impact of electricity shortages is a key problem in determining the optimal reliability of a nation's electrical system. The size of an electrical system's reserve margin will depend to a great extent on how the shortage value is determined. Telson (1975) used macroeconomic data to estimate the upper and lower bounds of the cost for unsupplied electricity. He found the present 1-day-in-10-years loss-of-load probability criterion to be uneconomically excessive and proposed that the criterion be reduced at least to the 5-days-in-10-years level.
AnderssonR.BohmP. (1981). Samhallsekonomisk utvdrdering av energi-projekt (The Social Evaluation of Energy Projects). Stockholm, Energy Production Research Board, NE 1981:12.
2.
BentalB.RavidS. (1982). “A simple method for evaluating the marginal cost of unsupplied electricity.” Belt Journal of Economics13:249-53.
3.
BergstromC. (1979). Akut energibrist. En planeriagsmodell (Acute Energy Shortage. A planning model). Stockholm, National Industrial Board, SIND 1979:2.
4.
BjerkholtO.OlsenO. (1982). “Firm power and uncertainty in hydroelectric power supply,” in Analysis of Supply and Demand of Electricity in the Norwegian Economy. Oslo, Central Bureau of Statistics of Norway.
5.
BlaalidS.LogS. (1977). Husholdningers etterspprsel etter elektrisitet 1966-1975. Oslo, Central Bureau of Statistics of Norway.
6.
CarlingA.DargayJ.OettingerC. (1982). “Om effekter av energiskatt” (“On the effects of energy taxes”). In Skatt pa energi, bilagor (Tax on Energy, annexes). Stockholm, SOU 1982:17 (Official Government Report from the Budget Department).
7.
CazaletE.ClarkC.KeelinT. (1978). Costs and Benefits of Over/Under Capacity in Electric Power System Planning. Palo Alto. Calif,: Electric Power Research Institute (EPRI).
8.
CDL (1978). Leveranssdkerhet med avseende pa energi, Rapport fran CDL-SA:s arbetsgrupp (Reliability with respect to energy. Report from the Central Power Supply Board's Working Group). Stockholm, Kraftsam (Joint Council of the Major Swedish Electric Power Producers, formerly CDL, Central Power Supply Board). .
9.
CrewM.KleindorferP. (1978). “Reliability and public utility pricing.” American Economic Review68:31-40.
10.
CrewM.KleindorferP. (1979). Public Utility Economics. New York, St. Martins Press.
11.
DargayJ. (1980). The Demand for Energy in Swedish Manufacturing. Stockholm, Industrial Institute for Economic and Social Research (IUI) Working Paper no. 13.
12.
MosbaekE. (1980). Analytical Framework for Evaluating Energy and Capacity Shortages. Palo Alto, Calif.: Electrical Power Research Institute (EPRI).
13.
MunasingheM.Gellersonand, M. 1979, “Economic criteria for optimizing power system reliability levels.” Bell Journal of Economics10:353-65.
14.
RodsethA.StromS. (1976). The Demand for Energy in Norwegian Households with special emphasis on the demand for electricity. Oslo, Memorandum from the Institute of Economics, University of Oslo.
15.
SanghviA. (1982). “Economic costs of electricity supply interruptions.” Energy Economics4:180-98.
16.
Svenska Elverksforeningen. (1982). Vardering av elavbrott (The Evaluation of Interruptions in the Supply of Electricity). Stockholm, Swedish Association of Electricity Supply Undertakers.
17.
TelsonM. (1975). “The Economics of alternative levels of reliability for electric power generation systems.” Bell Journal of Economics6:679-94.
18.
WalfridssonB.HjalmarssonL. (1982). “Nationell kraftpolitik efter 1990” (“National Power Policy After 1990”). In Kompletterande utredningar om re-gionens energiforsorjningssystem mm. Bilagor till yttrande over STOSEB 80 (Supplementary Investigations concern ing the Energy Supply System for the Region, etc. Annexes to opinions with regard to the Regional Energy Plan for Greater Stockholm-1980). Stockholm, Stockholm County Council, Regional Planning Office.