Electric utility system planners must design system capacity ex- pansion paths that satisfy generation requirements at least cost. Historically, doing this required information regarding the system load duration curve and alternative fuel and capital costs. By putting fuel and capital costs into a linear program, system designers could then calculate the amount of electricity that base, intermediate, and peaking plants should generate and how much capacity each plant type should have.
Get full access to this article
View all access options for this article.
References
1.
Anderson
Dennis
(1972 ). “Models for Determining Least-Cost Investments in Electricity Supply ,” Bell Journal of Economics and Management Science 3,12, (Spring): 267-301.
2.
Turvey
Ralph
(1968 ). Optimal Pricing and Investment in Electricity Supply.
3.London: George Allen and Unwin Ltd. , 1968
4.
Wenders
John T.
(1976 ). “Peak Load Pricing in the Electric Utility Industry .” Bell Journal of Economics 7, 4 (Spring ): 232 -241 .