Cost, duration, and other uncertainties of nuclear construction have recently been in the forefront of the news. Tales of mismanagement, inconsistent quality assurance, and utility financial woes have prompted many to ask why it takes so long and costs so much to build a nuclear power plant, and what the outlook is for plants currently under construction.
BaumanD. S.FeinsteinC. D.Radlauer M. A. (1984). An Analysis of Power Plant Construction Lead Times, Volume 2: Supporting Documentation and Appendixes. Final report prepared by Applied Decision Analysis, Inc. for Electric Power Research Institute. EPRI EA-2880, Vol. 2.
2.
BaumanD. S.MorrisP. A.RiceT. R. (1983). An Analysis of Power Plant Construction Lead Times. Volume 1: Analysis and Results. Final report prepared by Applied Decision Analysis, Inc. for Electric Power Research Institute. EPRI EA-2S80, Vol. 1.
3.
Energy Information Administration (1979). “Forecasting Future Nuclear Power Capacity.” Washington: U.S. Department of Energy, Technical Report TR/ES/79 (draft, May).
4.
KomanoffC. (1981). Power Plant Cost Escalation: Nuclear and Coal Capital Costs, Regulation, and Economics. New York: Komanoff Energy Associates.
5.
LovelaceW.(1981). Personal communication (October14).
6.
RadlauerM. A.BaumanD. S.ChapelS. W. (1984). “The Impact of Project Management on Nuclear Construction Lead Times.” Power Engineering (March1985), forthcoming.