MAP methods are continually being refined and expanded. In these concluding remarks I would like to touch on some of those developments, and then briefly to mention some steps that might be taken by an organisation that wants to explore this field further.
BakerM.P.MayfieldE.S.ParsonsJ.E. (1998). “Alternative Models of Uncertain Commodity Prices for Use in Modem Asset Pricing Methods,” The Energy Journal19(1). This issue.
2.
BradleyP.G. (1998). “On the Use of Modem Asset Pricing for Comparing Alternative Royalty Systems for Petroleum Development Projects,” The Energy Journal19(1). This issue.
3.
CavoulacosP.E.BlitzerC.R.LaughtonD.G. (1988). “Fiscal Risk and the Stability of Contractual Arrangements for Petroleum Exploration and Development” SPE 18512.
4.
LaughtonD.G. (1993). “Managing a Mining Venture Prior to Mine Development: Lessons from Modern Finance?” Proceedings of the Second Meeting of the Mineral Economics and Management Society.
5.
LaughtonD.G. (1998). “The Management of Flexibility in the Upstream Petroleum Industry,” The Energy Journal19(1). This issue.
SalahorG. (1998). “Implications of Output Price Risk and Operataing Leverage for the Evaluation of Petroleum Development Projects,” The Energy Journal19(1). This issue.