Abstract
Reaping the full benefits from cross-border interconnection typically requires reinforcement of national networks. When the relevant parts of the networks are complements, a lack of coordination between national transmission system operators results in investment below optimal levels in both interconnectors and national infrastructure. A subsidy to financially sustain interconnector building is not sufficient to restore optimality; indeed, even when possible, such subsidisation may have to be restrained so as not to encourage cross-border capacities that will not be fully utilised due to lack of investment in national systems.
Get full access to this article
View all access options for this article.
References
Supplementary Material
Please find the following supplemental material available below.
For Open Access articles published under a Creative Commons License, all supplemental material carries the same license as the article it is associated with.
For non-Open Access articles published, all supplemental material carries a non-exclusive license, and permission requests for re-use of supplemental material or any part of supplemental material shall be sent directly to the copyright owner as specified in the copyright notice associated with the article.
