Following tests of low power bulk Beryllium targets in 2016–2020, a high power target was designed, built and tested at the High Intensity Proton Injector (IPHI) at CEA Paris–Saclay. The design of the target and the results of the tests will be described.
AllisonJ.et al., Recent developments in GEANT4, Nuclear Instruments and Methods in Physics Research A835 (2016), 186–225. doi:10.1016/j.nima.2016.06.125.
2.
Compact accelerator based neutron sources, IAEA-TECDOC-1981, 2021.
3.
DarpentignyJ.et al., UCANS-9 proceedings, 2022.
4.
OttF.et al., The SONATE project, a French CANS for materials sciences research, EPJ Web of Conferences231 (2020), 01004. doi:10.1051/epjconf/202023101004.
5.
SenéeF.et al., Increase of iphi beam power at CEA saclay, in: 9th International Particle Accelerator Conference, Vancouver, Canada, Apr 2018, TUPAF016. doi:10.18429/JACoW--IPAC2018-TUPAF016.
6.
ThulliezL.et al., Improvement of Geant4 Neutron-HP package: From methodology to evaluated nuclear data library, Nucl. Instrum. Meth. A1027 (2022), 166187. doi:10.1016/j.nima.2021.166187.
7.
TranH.N.et al., Validation of Geant4 simulation tool for low energy proton induced reactions, IOP Conf. Series: Journal of Physics: Conf. Series1021 (2018), 012008. doi:10.1088/1742-6596/1021/1/012008.