Abstract
The problem of the optimal three-level location allocation of transfer center, processing factory and distribution center for supply chain network under uncertain transportation cost and customer demand are studied. We establish a two-stage fuzzy 0-1 mixed integer optimization model, by considering the uncertainty of the supply chain. Given the complexity of the model, this paper proposes a modified hybrid second order particle swarm optimization algorithm (MHSO-PSO) to solve the resulting model, yielding the optimal location and maximal expected return of supply chain simultaneously. A case study of clothing supply chain in Shanghai of China is then presented to investigate the specific influence of uncertainties on the transfer center, clothing factory and distribution center three-level location. Moreover, we compare the MHSO-PSO with hybrid particle swarm optimization algorithm and hybrid genetic algorithm, to validate the proposed algorithm based on the computational time and the convergence rate.
Keywords
Get full access to this article
View all access options for this article.
