The definition of a project's scope requires comprehensive specification of its work breakdown structure. An essential element of this is appropriate division of the project into manageable work packages. We present the main considerations relevant to determining the size and contents of work packages. We also provide two supporting tools: a checklist for examining the adequacy of the breakdown and a form for capturing the required information.
GlobersonS. (1994). Impact of various work breakdown structures on project conceptualization.International Journal of Project Management, 12(3), 165–171.
2.
GlobersonS., & ShtubA. (1995). Estimating the progress of projects.Engineering Management Journal, 7(3), 39–44.
3.
HallW. (1993, May). Scope management through a WBS.PM Network, 7(5), 12–18.
MatthewsM. (1993). Introducing networks to an in-progress project.Project Management Journal, 24(2), 9–16.
7.
MIL–STD–881A. (1975, April 25). Work breakdown structure for defense material items.
8.
Performance Measurement System Guidelines. (1977). Mini PMS guide, Attachment1 (pp. a1–4). Washington, DC: Department of Energy.
9.
PERT Coordinating Group. (1962, June). DOD and NASA guide, PERT cost systems design.
10.
Project Management Institute Standards Committee. (1996). A guide to the project management body of knowledge (PMBOK™ guide). Upper Darby, PA: Project Management Institute.
11.
RazT. (1997). Analysis of project work breakdown structures. Working paper, Faculty of Management, Tel Aviv University.