The problem and the solution. With the dramatic changes brought about by the technological advances affecting training along with demands of producing high-quality training quickly, some have suggested the analysis, design, develop, implement, evaluate (ADDIE) model of instructional development is no longer adequate.This article explores some of the process control and leadership techniques that might better equip training managers to succeed in their responsibilities.
Angus, R., Gundersen, N., & Cullinane, T. (2003). Planning, performing, and controlling projects; Principles and applications (3rd ed.). Upper Saddle River, NJ: Prentice Hall.
2.
Brill, J. M., Bishop, M. J., & Walker, A. E. (in press). An investigation into the competencies required of an effective project manager. Educational Technology Research & Development.
3.
Briner, W., Geddes, M., & Hastings, C. (1990). Project leadership. New York: Van Nostrand Reinhold.
4.
Gilley, J. W., Eggland, S. A., & Gilley, A. M. (2002). Principles of human resource development. Cambridge, MA: Perseus.
5.
Kerzner, H. (2001). Project management: A systems approach to planning, scheduling, and controlling (7th ed.). New York: John Wiley.
6.
Lehigh University, College of Education, Educational Technology. (2006). Certificate program in project management [Brochure]. Retrieved January 6, 2006, from www.lehigh.edu/collegeofeducation/degree_programs/ed_technology/assets/pdf/PMCert1-pager-112204.pdf
7.
van Meel, R. M. (1993). Project-based module development (Report No. ISBN-90-358-1241-7). Heerlen, The Netherlands: Centre for Educational Technology and Innovation. (ERIC Document Reproduction Service No. ED734212)
8.
Meredith, J., & Mantrel, S., Jr. (1989). Project management; A managerial approach (2nd ed.). New York: John Wiley.
9.
Noble, M. J., & Borlander, A. (2005). E-management for e-learning projects. Retrieved January 7, 2006, from www.allencomm.com/download/files/WhitePapers/eLearningPMWhitePaper.pdf
10.
Piskurich, G., & Sanders, E. (1998). ASTD models for learning technologies: Roles, competencies and outputs. Alexandria, VA: American Society for Training and Development.
11.
Project Management Institute Standards Committee. (1996). A guide to the project management body of knowledge. Sylva, US: PMI Publishing Division.
12.
Richey, R. C., Fields, D. C., & Foxon, M. (2001). Instructional design competencies: The standards (No. IR-111). Syracuse, NY: International Board of Standards for Training, Performance, and Instruction. (ERIC Document Production Service No. ED453803)
13.
Schiffman, S. S. (1995). Instructional systems design: Five views of the field. In G. Anglin (Ed.), Instructional technology: Past, present, and future (2nd ed., pp. 131-142). Westport, CT: Libraries Unlimited.
14.
Sink, D. L. (2002). ISD: Faster, easier, better. Performance Improvement Journal, 4(7), 16-22.
15.
Sioutine, A. (1999, June). Conceptual and dynamic modeling of the project management for development of courseware systems for distance learning programs. Paper presented at the meeting of the Institute of Informatics and Mathematical Modeling of Technological Processes, Apatity, Murmansk Region, Russia.
16.
Sleezer, C. M., & Swanson, R. A. (1989). Is your training department out of control?Performance and Instruction, 28(5), 22-26.
17.
Tennyson R. D. (Ed.). (1994). Automating instructional design, development, and delivery. New York: Springer-Verlag.
18.
U.S. Department of the Air Force. (2002). Information for designers of instructional systems advanced distributed learning: Instructional technology and distance learning (Air Force Handbook 36-2235 Vol. 5). Washington, DC: Author.
19.
Fabac, J. N. (2006). Project management for systematic training. Advances in Developing Human Resources, 8(4), 540-547.