The basis for risk-time curves associated with remediation of hazardous waste sites is developed. The utility of the risk-time curves as a part of a methodology for selecting between alternative remediation schemes is demonstrated when the time-frames for remediation are different for different alternatives. The potential for inclusion of uncertainty aspects in risk-time curves is considered.
Get full access to this article
View all access options for this article.
References
1.
Bethea, R., Duran, B. & Boullion, T. (1985). Statistical Methods for Engineers and Scientists . Marcel Dekker Inc., N.Y., U.S.A.
2.
McTernan, W. F. & Kaplan, E., eds. (1990). Risk Assessment for Groundwater Pollution Control, Monograph of the American Society of Civil Engineers, New York, N.Y., U.S.A.