Increasing the run-length of a non- terminating steady-state simulation improves confidence in the results obtained. Yet the questions need to be asked: how long should a run be and what level of confidence is obtained? This paper describes an heuristic technique for selecting the run-length which enables the user to measure the level of confidence achieved. An heuristic technique has been developed deliberately to enable implementation by both expert and non- expert users.
Bell, P.C. and O'Keefe, R.M. (1987). "Visual Interactive Simulation - History, Recent Developments, and Major Issues." SIMULATION, 49 (No. 3), pp. 109-116.
2.
Paul, R.J. (1991). "Recent Developments in Simulation Modelling." Journal of the Operational Research Society, 42 (No. 3), pp. 217-226.
3.
Robinson, S. (1994). "Improving Current Practice in Simulation Modelling and Analysis." Paper presented at TIMS/ORSA Boston Meeting, April.
4.
Wadsack, K. and Tobias, A. (1994). "Stimulating Good Simulation." OR Itisight, 7 (No. 1), pp. 28-31.
5.
Welch, P. (1983). "The Statistical Analysis of Simulation Results .'' In: The Computer Performance Modeling Handbook (Lavenberg, S. ed.). NY: Academic Press, pp. 268-328.
6.
Law, A. and Kelton, W. (1991). Simulation Modeling and Analysis, 2nd ed. New York: McGraw-Hill International Editions.
7.
Gogg, T. and Mott, J. (1992). Improve Quality and Productivity with Simulation . Palos Verdes Peninsula, CA: JMI Consulting Group.
8.
Robinson, S. (1994). Successful Sinnulation: A Practical Approach to Sintulation Projects. Maidenhead, England: McGraw-Hill.
9.
Wadsack, K.M. and Tobias, A.M. (1994). The Simulation Project Adviser. England: University of Birmingham.