Abstract
This is a two-part review describing the planning, engineering, and design considerations for building a new repository for biological and environmental samples. Part I addresses the physical infrastructure requirements for a repository; Part II will cover equipment and costing. Planning for construction of a new repository is a complex process requiring comprehensive preplanning and adherence to many regulatory and safety requirements. Guidance and a planning timeline are provided for many of the physical aspects and large capital acquisition costs for the expansion of an existing repository, or the creation of a new repository facility, using an available unoccupied building such as a former warehouse. This article provides a comprehensive set of information about every aspect of repository construction and operation to be considered in the planning process, and also addresses all aspects of designing and constructing a new repository in an existing structure. The engineering and design parameters for the repository are discussed in detail.
Get full access to this article
View all access options for this article.
