Cogeneration-a technology which uses waste heat for electricity generation-has been known for over one hundred years. To be economically viable, it requires that excess electricity be fed into a grid for distribution. In the U.S., utilities have been legally obliged by PURPA legislation (Public Utility Regulation Practices Act) to put their grids at the disposal of electricity suppliers in industry. Nonetheless, cogeneration has recently accounted for no more than 14 percent of electricity used in industry (Anandalingam, 1985). Thus, PURPA legislation may not be enough to open markets to cogenerators.
AnandalingamG(1985). “Government Policy and Industrial Investment in Cogeneration in the USA.” Energy Economics7 (2) (April) pp. 117-126.
2.
AverchH.JohnsonL. L. (1962). “Behavior of the Firm under Regulatory Constraint.” American Economic Review52(5) (December), pp. 1053-1069.
3.
BaileyE. E. (1973). Economic Theory of Regulatory Constraint. Lexington, Mass.: Lexington Books.
4.
BaileyE. E.WhiteL. J. (1974). “Reversals in Peak and Off-Peak Prices.” Bell Journal of Economics5(1) (Spring), pp. 75-92.
5.
BaughmanM. L.JoskowP. L. (1976). “The Future of the U.S. Nuclear Energy Industry.” Bell Journal of Economics7(1) (Spring), pp. 14-17.
6.
ChiangA. C. (1974). Fundamental Methods of Mathematical Economics, 2nd ed. Tokyo: McGraw-Hill International Student Edition.
7.
SheraliH. D.SoysterA. L.MurphyF. H.SenS. (1984). “Intertemporal Allocation of Capital Costs in Electric Utility Capacity Expansion Planning Under Uncertainty.” Management Science30(1) (January), pp. 1-19.
8.
WeitzmanM. (1970). “Iterative Multilevel Planning with Production Targets.” Econometrica38 (January), pp. 50-65.
9.
WendersJ. T. (1976). “Peak Load Pricing in the Electric Utility Industry.” Bell Journal of Economics7(1) (Spring) pp. 232-241.