In this paper, we model a two-period electricity market with interdependent demand, where oligopolistic generators make investments in peak- and baseload capacities. Different prices are obtained in the two periods, and residential consumers can react to prices across demand periods. We characterize the Cournot equilibrium obtained as a function of price and cross-price effects and present a numerical illustration based on the Ontario (Canada) electricity market.
AignerD.J.NewmanJ.TishlerA. (1994). “The Response of Small and Medium Size Business Customers to Time-of-Use (TOU) Electricity Rates in Israel.” Journal of Applied Econometrics.9(3): 283-304.
2.
AyresM.MacRaeM.StogranM. (2004). Levelised Unit Electricity Cost Comparison of Alternate Technologies for Baseload Generation in Ontario, Prepared for the Canadian Nuclear Association, Calgary: Canadian Energy Research Institute.
3.
BaladiS.M.HerrigesJ.A.SweeneyTJ. (1998). “Residential Response to Voluntary Time-of-Use Electricity Rates.” Resource and Energy Economics.20: 225-244
4.
BohnR.E.CaramanisM.C.SchweppeF.C. (1984). “Optimal Pricing in Electrical Networks Over Space and Time.” RAND Journal of Economics15(3): 360-376.
5.
BoiteuxM. (1949). “La tarification des demandes en pointes.” Revue generate de l’electricite58: 321-340; translated as “Peal-Load Pricing”, Journal of Business 33(2): 157-179 (1960).
6.
BolleF. (1992). “Supply Function Equilibria and the Danger of Tacit Collusion: The Case of Sport Markets for Electricity.” Energy Economics14: 94-102.
7.
BorensteinS. (2005). “The Long-Run Effeciency of Real-Time Electricity Pricing.” The Energy Journal26(3): 93-116.
8.
CavesD.W.ChristensenL.R.HerrigesJ.A. (1984). “Consistency of Residential Customer Response in Time-of-Use Electricity Pricing Experiments.” Journal of Econometrics26: 179-203.
9.
CrewM.A.FernandoC.S.KleindorferP.R. (1995). “The Theory of Peak-Load Pricing: A Surve.” Journal of Regulatory Economics8: 215-248.
10.
Energy Information Administration (EIA) (2006). Assumptions to the Annual Energy Outlook 2006, DOE/EIA-0554(2006), Washington: EIA.
11.
FilippiniM. (1995). “Electricity Demand by Time of Use - An Application of the Household AIDS Model.” Energy Economics17(3): 197-204.
12.
GreenR.J.NewberyD.M. (1992). “Competition in the British Electricity Spot Market.” Journal of Political Economy100: 929-953.
13.
IESO (Independent Electricity System Operator) (2005a). Monthly Generator Disclosure Report -September2004, Generator Disclosure - Monthly Generator Disclosure Report, Web page, accessed April 15, 2005. http://www.ieso.ca/imoweb/marketdata/genDisclosure.asp
14.
IESO (2005b). Hourly Demands and Hourly Ontario Energy Price (HOEP), Market Summaries -Downloadable data, Web page, accessed April 15,2005. http://www.ieso.ca/imoweb/marketdata/marketSummary.asp
15.
LaffertyR.HungerD.BallardJ.MahrenholzG.MeadD.BanderaD. (2001). “Demand Responsiveness in Electricity Markets.” Office of Markets, Tariffs and Rates, Federal Energy Regulatory Commission.
16.
LawrenceA.AignerD. (eds.) (1979). “Modelling and Forecasting Time-of-Day and Seasonal Electricity Demands.” Journal of Econometrics, Annals of Applied Econometrics 1979-1 A Supplement to the Journal of Econometrics, 9.
17.
LawrenceA.BraithwaitS. (1979). “The Residential Demand for Electricity with Time-of-Day Pricing.” Journal of Econometrics9 (supplement): 59-77.
18.
ManningW.G.Jr.MitchellB.M.ActonJ.P. (1979). “Design of the Los Angeles Peak-Load Pricing Experiment for Electricity.” Journal of Econometrics11: 131-193.
19.
MatsukawaI. (2001). “Household Response to Optional Peak-Load Pricing of Electricity.” Journal of Regulatory Economics20(3): 249-267.
20.
MountainD.C.LawsonE.L. (1995). “Some Initial Evidence of Canadian Responsiveness to Time-of-Use Electricity Rates: Detailed Daily and Monthly Analysis.” Resource and Energy Economics17(2): 189-212.
OEEC (Organisation for European Economic Co-operation) (1958). The Theory of Marginal Cost and Electricity Rates, Paris: OEEC.
23.
PineauP.-O.MurtoP. (2003). “An Oligopolistic Investment Model of the Finnish Electricity Market.” Annals of Operations Research, Special Volume on OR models for energy policy, planning and management121: 123-148.
24.
Royal Academy of Engineering (2004). The Costs of Generating Electricity. London: The Royal Academy of Engineering.
25.
SteinerP.O. (1957). “Peak Loads and Efficient Pricing.” Quarterly Journal of Economics71: 585-610.
26.
SternD.I. (2004). “Elasticities of Substitution and Complementarity.” Rensselaer Working Papers in Economics 0403, Department of Economics, Rensselaer Polytechnic Institute.
27.
StevensB.LernerL. (1996). “Testimony on The Effect of Restructuring on Price Elasticities of Demand and Supply.” Prepared for the August 14, 1996 ER 96 Committee Hearing, California Energy Commission.
28.
StoftS. (2002). Power System Economics: Designing Markets for Electricity. Piscataway: IEEE Press.
29.
SweeneyJ. (2002). The California's Electricity Crisis. Stanford: Hoover Institution Press.
30.
TaylorT.N.SchwarzP.M. (1990). “The Long-Run Efficiency of Time-of-Use Demand Charge.” Rand Journal of Economics21(3): 431-445.
31.
TrainK.MehrezG. (1994). “Optional Time-of-Use Prices for Electricity: Economitric Analysis of Surplus and pareto Impacts.” Rand Journal of Economics25(2): 263-283.
32.
TishlerA.YeY. (1993). “Minimal Adjustment Costs, Factor Demands, and Seasonal Time-of-Use Electricity Rates.” Resources and Energy Economics15: 313-335.
33.
TrebilcockM.J.HrabR. (2005). “Electricity Restructuring in Ontario.” The Energy Journal26(1): 123-146.
34.
TurveyR. (1968). “Peak-Load Pricing.” Journal of Political Economy76(1): 101-113.
35.
WilliamsonO.E. (1966). “Peak-Load Pricing and Optimal Capacity Under Indivisibility Constraints.” American Economic Review56(4): 810-827.