ChowR.F.ToneguzzoJ.P.SperouG.A.BrownK.HoriiB.K.OransR (1995). “Local Integrated Resource Planning of a Large Load Supply System,” Canadian Electrical Association, Vancouver.
3.
CPUC (1996). California Public Utilities Commission, “Order Instituting Rulemaking on the Commission’s Proposed Policies Governing Restructuring California’s Electric Services Industry and Reforming Regulation.” D96-12-088
4.
CPUC and CEC (1987). Standard Practice Manual: Economic Analysis of Demand Side Management Programs.
5.
DuganR.Balland G., (1995). “Engineering Handbook for Dispersed Energy Systems on Utility Distribution Systems,” Report No. TR-105589, Electric Power Research Institute.
6.
EPRI (various years). “Cost-Benefit Analysis of Power System Reliability: Determination of Interruption Costs, Vols. 1-3,” (EL-6791).
7.
EPRI (1997). “Engineering Design and Costing Model User’s Manual” Version 1.0, (Pending release).
8.
ForteV.J.PuppR.PutnamR.WooC.K. (1995). “Using Customer Outage Costs in Electricity Reliability Planning,” Energy - The International Journal20(2): 81-87.
9.
IEEE Guide for Loading Mineral Oil Immersed Transformers Up to and Including 100 MVA with 55°C or 65°C Average Winding Rise, ANSI/IEEE C57.91-1981.
10.
JoskowP.L. (1997). “Restructuring, Competition and Regulatory Reform in the U.S. Electricity Sector,” The Journal of Economic Perspectives11(3): 119-138.
11.
KeaneD.M.WooC.K. (1992). “Using Customer Outage Costs to Plan Generation Reliability,” Energy - The International Journal17(9): 823-827.
12.
MasseyW.L. (1997). “Transmission Pricing Reform: FERC’s Next Frontier,” The Electricity Journal (July): 14-20.
13.
MunasingheM. (1979). The Economics of Power System Reliability and Planning, Barlimore, MD: Johns Hopkins.
14.
MunasingheM.WooC.K.ChaoH.P. (1988). Special Electricity Reliability Issue, The Energy Journal 9.
15.
OransR.WooC.K.HoriiB. (1994). “Targeting Demand Side Management for Electricity Transmission and Distribution Benefits,” Managerial and Decision Economics15: 169-175.
PG&E,(1991). “Marginal Costs,” Testimony submitted to California Public Utilities Commission for 1993 Test Year General Rate Case, San Francisco, California.
18.
PolandW.B., (1988). “Importance of including uncertainties in economic generation planning,” Special Electricity Reliability Issue, Energy Journal9: 19-32.
19.
WooC.K.PuppR.L. (1992). “Costs of Service Disruptions to Electricity Consumers,” Energy - The International Journal17(2): 109-126.
20.
WooC.K.Lloyd-ZannettiD.OransR.HoriiB.HeffnerG. (1995). “Marginal Capacity Costs of Electricity Distribution and Demand for Distributed Generation,” The Energy Journal16(2): 111-129.
21.
WooC.K.PuppR.L.MangoR.FlaimT. (1991). “How Much Do Electricity Consumers Want to Pay for Reliability?” Energy Systems and Policy15: 145-159.