BellmanR. (1957). Dynamic Programming. Princeton, NJ: Princeton University Press.
2.
BlissG.A. (1925). The Calculus of Variations. Mathematical Association of America, LaSalle, Illinois: Open Court Publishing Company.
3.
BullardC.W. (1980). “Value of Dispersed Intermittent Electricity Generation.” DE81015033. Presented at National Conference on Renewable Energy Technologies, Honolulu.
4.
ChapelS.W.FeinsteinC.D.OransR. (1993). “Evaluation of Utility Grid-Connected Battery Plants Using Area- and Time-Specific Marginal Costs.” Fourth International Conference, Batteries for Energy Storage, Vol. II, 140-71.
5.
ChapelS.W.RichardsonD. (1996). New T&D Planning Methodology. EPRI Report IN-105750, EPRI, Palo Alto, CA.
6.
ChovaniecC.R.MaidenJ.L.KirshbaumH.S.PeduskaW. (1978). “Energy Storage Operation of Combined Photovoltaic/Battery Plants in Utility Networks.” Presented at 13th IEEE Photovoltaic Specialists Conference, 1185-89, Washington, DC.
7.
ChowR. (1996). “Local Integrated Resource Planning: Ontario Hydro TIES Study.” Presented at DA/DSM DistribuTECH Conference, Tampa Bay, FL.
8.
DavitianH. (1981). “Methods for Analyzing the Value and Avoided Costs Associated with Dispersed Technologies.” DE82013427. Presented at Utility Planning--Consumer’s Side of the Meter Conference, Bloomington, MN.
9.
Edison Electric Institute (1994). Statistical Yearbook of the Electric Power Industry, 1994. Washington, DC.
FeinsteinC.D. (1993). An Introduction to the Distributed Utility Valuation Project Monograph. EPRI Report TR-102461, PG&E Report 005-93.13, EPRI, Palo Alto and PG&E, San Ramon, CA.
12.
FeinsteinC.D. (1996). “New Approaches to Local Area Planning: Methodology.” Presented at DA/DSM DistribuTECH Conference, Tampa Bay, FL.
13.
FeinsteinC.D.MorrisP.A. (1997a). Dynamic Probabilistic Models of Area Load Growth. EPRI Report Forthcoming. EPRI, Palo Alto, CA.
14.
FeinsteinC.D.MorrisP.A.ChapelS.W.ThapaM.N.WanS. (1997b). Load Dynamics: A Model for Developing Probabilistic Forecasts of Load Conditions. User’s Guide. EPRI, Palo Alto, CA.
15.
FeinsteinC.D.OransR.ChapelS.W. (1997c). “The Distributed Utility: A New Electric Utility Planning and Pricing Paradigm.” Annual Reviews of Energy and the Environment, Forthcoming.
16.
FeinsteinC.D.MorrisP.A. (1997d). An Investment Strategy Model for Local Area Expansion Planning. EPRI Report,Forthcoming. EPRI, Palo Alto, CA.
17.
FeinsteinC.D.LesserJ.A. (1997e). “Defining Distributed Resource Planning.” The Energy Journal, (Special Issue) Distributed Resources: Toward a New Paradigm of the Electricity Business.
18.
FingerS. (1981). Integration of Decentralized Generators with the Electric Power Grid. MIT Energy Lab. MIT-EL-81-011. M.I.T., Cambridge, MA.
HoffT.E. (1996). “Identifying Distributed Generation and Demand Side Management Investment Opportunities.” The Energy Journal17(4): 89-105.
21.
HowardR.A. (1971). Dynamic Probabilistic Systems. New York: John Wiley.
22.
KharatishviliG.L. (1967). “A Maximum Principle in Extremal Problems with Delays,”in Mathematical Theory of Control. Balakrishnan, A.V. and Neustadt L.W., eds. New York: Academic Press: 26-34.
23.
KoenigE.F. (1981). “Electric Utility Rate Structures and Distributed Thermal Energy Storage: A Cost-Benefit Analysis.” Energy6: 457-70.
24.
LeeS.T.PeschonJ.GermondA. (1979). Impacton Transmission Requirements of Dispersed Storage and Generation. EPRI Report EM-1192, EPRI, Palo Alto, CA.
25.
LeeS.T.PeschonJ. (1979). “Impact of Dispersed Generation on Transmission and Subtransmission Requirements.“CONF-791006. Presented at Joint Power Generation Conference, Charlotte, NC.
26.
LesserJ. A. (1996). “What If It Snows? Weather Uncertainty and DU Planning.” Presented at 2nd Annual Distributed Resources Conference, EPRI, Vancouver, BC.
27.
LoganDMNeilCATaylorASLilienthalP.1995. “Integrated Resource Planning with Renewable Resources.” The Electricity Journal8: 26-36.
28.
MaF.IsaksenL.PattonR. (1979). Impacts of Dispersing Storage and Generation in Electric Distribution Systems. DOE/ET/1212.1, Systems Control, Inc., Palo Alto, CA.
29.
MaF.S.CurticeD.H. (1982). “Distribution Planning and Operations with Intermittent Power Production.” CONF-820134. Presented at IEEE Power Engineering Soc. Winter Meeting, New York.
30.
ManneA.S. (1961). “Capacity Expansion and Probabilistic Growth.” Econometrica29(4) (October): 632-649.
31.
MillerA.RiceT. (1983). “Discrete Approximations to Probability Distributions.” Management Science29(3): 352-362.
32.
MorrisP.A.WongK.L.WoodR.O. (1994). EPRI Investment Strategies Project, Volume I: Value of Flexibility and Modularity of Distributed Generation. EPRI Report TR-104171, EPRI, Palo Alto, CA.
33.
MorrisP.A. (1996). “Optimal Strategies for Distribution Investment Planning.” Presented at 2nd Annual Distributed Resources Conference, EPRI, Vancouver, BC.
34.
OransR.WooC.K.SwisherJ.N.WiersmaW.HoriiB. (1991). Targeting DSM for T&D Benefits: A Case Study of PG&E’s Delta District. EPRI Rep. TR100487, EPRI, Palo Alto, CA.
35.
OransR.WooC.K.HoriiB. (1994). “Case Study: Targeting Demand-side Management for Electricity Transmission and Distribution Benefits.” Managerial and Decision Economics15(2): 169-175.
36.
PontryaginL.S.BoltyanskiiV.G.GamkrelidzeR.V.MischenkoE.F. (1962). The Mathematical Theory of Optimal Processes. KN Trirogoff, trans. LW Neustadt, ed. Interscience, New York: John Wiley.
37.
PuppR. (1993). Distributed Utility Valuation Project Monograph. EPRI Report TR-102807, PG&E Report 005-93.12, EPRI, Palo Alto and PG&E, San Ramon, CA.
38.
RigneyD.M.KekelaJ.LeeS.T.PangC.K. (1984). “Expansion Planning with Dispersed Fuel Cell Power Plants on Actual Utility Systems.” IEEE Transactions. Power App. Sys. PAS-103: 2388-97.
39.
ShugarDEl-GasseirM.JonesA.Orans R.SuchardA.(1991). Benefits of Distributed Generation in PG&E’s T&D System: A Case Study of Photovoltaics Serving Kerman Substation. PG&E Internal Report, PG& E, San Ramon, CA.
40.
SobieskiD.W.BhavarajuM.P. (1985). “An Economic Assessment of Battery Storage in Electrical Utility Systems.” IEEE Transactions. Power App. Sys. PAS-104: 3453-59.
41.
TaborsR.D.FingerS.CoxA.J.(1981). “Economic Operation of Distributed Power Systems within an Electric Utility.” CONF-810201. Presented at IEEE Power Engineering Society, Atlanta, GA.
42.
Van HorneP.R.GarverL.L.MiscallyA.E. (1981). “Transmission Plans Impacted by Generation Siting--A New Study Method.” IEEE Transactions. Power App. Sys. PAS-100: 2563-67.
43.
ZainingerH.W.ClarkH.K.BrownellG.C. (1990). Potential Economic Benefits of Battery Storage to Electrical Transmission and Distribution Systems. Final Report EPRI GS-6687, Project 1084-35, EPRI, Palo Alto, CA.