Abstract
In this paper we analyze a uniform price day-ahead electricity spot market that is followed by redispatch in the case of network congestion. We assume that the transmission system operator is incentivized to minimize redispatch cost and compare cost-based redispatch (CBR) to market-based redispatch (MBR) mechanisms. For networks with at least three nodes we show that in contrast to CBR, in the case of MBR incentives to minimize redispatch cost are in general not efficient in the context of our short-run analysis. This obtains both for pay-as-bid as well as locational marginal prices used for MBR compensation. As we demonstrate, moreover, in case of MBR the possibility of the transmission system operator to inefficiently reduce redispatch cost at the expense of decreased overall welfare can be driven both by the electricity supply side and the electricity demand side.Our results highlight a novel and important aspect regarding the design and the desirability of congestion management regimes in liberalized electricity markets.
Get full access to this article
View all access options for this article.
References
Supplementary Material
Please find the following supplemental material available below.
For Open Access articles published under a Creative Commons License, all supplemental material carries the same license as the article it is associated with.
For non-Open Access articles published, all supplemental material carries a non-exclusive license, and permission requests for re-use of supplemental material or any part of supplemental material shall be sent directly to the copyright owner as specified in the copyright notice associated with the article.