Abstract
Energy-efficient flexible job shop scheduling problems (EFJSP) have been investigated fully; however, energy-related objectives often have lower importance than other ones in many real-life situations and this case is hardly considered in the previous works. In this study, EFJSP with sequence-dependent setup times (SDST) is considered, in which total tardiness and makespan are given higher importance than total energy consumption. A two-phase imperialist competitive algorithm (TPICA) is proposed. The importance difference among objectives is implemented by treating all objectives equally in the first phase and making energy consumption not to exceed a diminishing threshold in the second phase. A dynamical differentiating assimilation and a novel imperialist competition with the enforced search are implemented. Extensive experiments are conducted and the computational results show that TPICA is very competitive for EFJSP with SDST.
Keywords
Get full access to this article
View all access options for this article.
