Abstract
As one kind of highest hierarchy node on the network, the transfer scheme of high-speed railway hub timetable should be studied at priority. After defining the problem that optimizing transfer scheme of timetable at high-speed railway hub, this paper proposes time adjusting strategy and platform adjusting strategy to optimize the problem, of which the first strategy introduces a FUZZY set of reasonable time range to reduce the possible train conflicts at adjacent stations on the network, and the second strategy helps to use different transfer time to match the arrival and departure of trains. Then, an optimization model of timetable based on passenger transfer is established with the minimized invalid transfer waiting time for passenger and train conflicts at adjacent stations as the objective function. The model is solved by the above two strategies in MATLAB software. Finally, the rationality and effectiveness of this model are verified, taking Shanghai Hongqiao Station as an example.
Get full access to this article
View all access options for this article.
