Abstract
This paper summarizes the findings of research conducted for the Texas Department of Transportation (DOT) that produced a master plan for the Gulf Intracoastal Waterway in Texas (GIWW-T). The project (a) established a baseline for the condition and utilization of the GIWW-T; (b) examined the major operational concerns, mostly related to dredging and navigational safety; (c) investigated the impacts of operational obstacles; (d) determined what is needed to restore the GIWW-T to and sustain its optimum level; (e) investigated potential economic and legislative limitations; and (f) recommended potential courses of action that might enable the Texas DOT to play an active role in achieving a highly efficient and safe GIWW-T. A working group of GIWW-T stakeholders informed the research. Participants included the U.S. Army Corps of Engineers, the U.S. Coast Guard, port authorities, the Texas DOT, and barge industry representatives.
Get full access to this article
View all access options for this article.
