A 36-km section of a tolled highway bypass of Toronto, the Highway 407 Express Toll Route, has been completed and is in operation. Included in the planning for the aforementioned is a “transitway” function. A property protection study was initiated to develop a transitway system plan and a station site plan. This study generated estimates of future transit ridership and developed hierarchical station configurations based on technology choices.
Get full access to this article
View all access options for this article.
References
1.
McCormick Rankin. Metropolitan Toronto High Occupancy Vehicle (HOV) Network Study. Final Report. Metropolitan Toronto Transportation Department, March1992.
2.
DanielsG.Are HOV Lanes Cost Effective Improvements? An Analysis of the Benefits and Costs of Texas HOV Lanes. Presented at Institute of Transportation Engineers Conference, Toronto, 1998.
3.
McCormick Rankin. Transitway Corridor Protection Study, Highway 407/Parkway Belt West Corridor, from Highway 403 to Markham Road, Plans and Profiles. Ontario Ministry of Transportation, Dec.1998.