This powerful and popular mathematical business tool can often be built into existing cost accounting and control programs and serve management in many ways. However, it requires statistical analysis to achieve maximum effectiveness.
Get full access to this article
View all access options for this article.
References
1.
AndressFrank J., “The Learning Curve as a Production Tool,”Harvard Business Review, January-February, 1954, p. 87.
2.
ConwayRichard W.SchultzAndrewJr., “The Manufacturing Progress Function,”Journal of Industrial. Engineering, Vol. X, No. 1, January-February, 1959.
3.
DeJongJ. R., “The Effects of Increasing Skill on Cycle Time and Its Consequences for Time Standards,”Ergonomics, Taylor & Francis Ltd., London, November, 1957, p. 51–60.
4.
GeppingerH. C., “Newest Way to Pay for Short Run Jobs,”Factory Management and Maintenance, November, 1956, p. 112.
5.
GhormleyG. E., “The Learning Curve,”Western Industry, September, 1952.
6.
HirschW. Z., “Manufacturing Process Functions,”The Review of Economics and Statistics, Vol. 34, May, 1952, p. 143–155.
7.
KoenF. T., “Dynamic Evaluation,”Factory Management and Maintenance, September, 1959.
8.
ThueH. J.MaynardB. I.ShappellN. H., “Time Reduction Curves,”Proceedings 5th Annual Industrial Engineering Institute, University of California, January 30–31, 1953, p. 27–34.