Abstract
The decision-making process involving the decommissioning of the British graphite-moderated, gas-cooled Magnox power stations is complex. There are timing, engineering, waste disposal, cost and lost generation capacity factors and the ultimate uptake of radiation dose to consider and, bearing on all of these, the overall decision of when and how to proceed with decommissioning may be heavily weighed by political and public tolerance dimensions. These factors and dimensions are briefly reviewed with reference to the ageing Magnox nuclear power stations, of which Berkeley and Hunterston A are now closed down and undergoing the first stages of decommissioning and Trawsfynydd, although still considered as available capacity, has had both reactors closed down since February 1991 and is awaiting substantiation and acceptance of a revised reactor pressure vessel safety case. Although the other first-generation Magnox power stations at Hinkley Point, Bradwell, Dungeness and Sizewell are operational, it is most doubtful that these stations will be. able to eke out a generating function for much longer.
It is concluded that the British nuclear industry has adopted a policy of deferred decommissioning, that is delaying the process of complete dismantlement of the radioactive components and assemblies for at least one hundred years following close-down of the plant. In following this option the nuclear industry has expressed considerable confidence that the decommissioning technology required will he developed with passing time, that acceptable radioactive waste disposal methods and facilities will be available and that the eventual costs of decommissioning will not escalate without restraint.
Get full access to this article
View all access options for this article.