Abstract
This paper gives a review of applications within the Unilever Group, including plants in operation and studies that did not result in implementation, discusses the development of Unilever's Mersey side site and gives a review of Unilever's recently completed remodelling of the Merseyside Power Station, Port Sunlight, including the financial case, how it is put into practice and operating experience.
The oil-fired high-pressure boilers/backpressure steam turbines station now incorporates a 105 tonne/h, 103 bar, 510°C, spreader stoker coal-fired boiler and a 9.5 MWe heavy fuel oil-burning medium-speed diesel engine. Both operate on ‘base load’. The station is flexibly integrated by means of feedwater and air heating systems.
Get full access to this article
View all access options for this article.
