Fast reactor fuel has been reprocessed at Dounreay since 1960. This paper describes the operation of the reprocessing and waste management facilities associated with the reprocessing of the prototype fast reactor (PFR) since the start of operation on this project in 1980.
Get full access to this article
View all access options for this article.
References
1.
BarrettT. R.The reconstruction of the fast reactor fuel reprocessing plant, Dounreay. Symposium on Fast reactor fuel reprocessing, May 1979 (Society of Chemical Industry).
2.
AllardiceR. H.. Management of radioactive solid waste arising from PFR reprocessing. International Conference on Fast reactor fuel cycles, London, November 1981 (British Nuclear Energy Society).
3.
BarrettT. R.. Conference on Radioactive facilities, Grange-over-Sands, Lancashire, 1980, paper 42 (British Nuclear Energy Society).
4.
MillsA. L.PFR fuel reprocessing scheme—flowsheets and chemistry. Symposium on Fast reactor fuel reprocessing, May 1979 (Society of Chemical Industry).
5.
ShimminF. N. J.Report on civil engineering and construction of the Dounreay and Winfrith sea discharge pipeline. Instn Publ. Health Engrs J., 3 July 1963, 62.
6.
BremnerW. B.. Operational experience relating to measurement of plutonium in solid and liquid waste streams from fast breeder reactor fuel reprocessing. Report IAEA-SM-260/68 (International Atomic Energy Agency).