Reviews current practice and problems in the contractual relationship between customer and contractor in the design and construction of engineering plant.
Get full access to this article
View all access options for this article.
References
1.
WearneS. H.A review of reports of failures. Proc. Instn Mech. Engrs, 1979, 193, 125–136, and discussion (paper based upon study of 13 major industrial failures).
2.
KharbandaO. P.StallworthyE.How to learn from project disasters, 1983, Gower Press.
3.
BealeH. G.DugdaleA. M.For research on engineering contracts in the UK see: Contracts between businessmen. British Journal of Law and Society, 1975, 2, 45–60.
4.
PerryJ. G.A guide to target and cost-reimbursable construction contracts. Report No. 85, 1980, Construction Industry Research and Information Association.
5.
HayesR.PerryJ. G.ThompsonP. A.Management Contracts, Report No. 100, 1983, Construction Industry Research and Information Association.
6.
ScottP.The commercial management of engineering contracts, 1974, Gower Press.
7.
Duncan WallaceI. N.Further building and engineering standard forms, 1973, Sweet and Maxwell.
8.
Conditions of engagement, Association of Consulting Engineers.
9.
Comments on the problems of matching the liabilities of main and sub-contractors were given in the Terms of Contract Handbook produced by BRIMEC in 1974.
10.
BS 3915: 1965.
11.
Guidance on the powers and duties of the Engineer to the ICE contract is given in Guidance Note 2 issued by the Standing Joint Committee on Conditions of Contract in 1977.
12.
UffJ.Design liability: who carries the can?New Civil Engineer, 19 Nov. 1981, 26–27.
13.
ReeveD. A. D.For a summary of a discussion on the problems of the role of the Engineer in practice in civil engineering in the UK seeProc. Instn Civ. Engrs, 1982, 72, part 1, 255–8.
14.
See recommendations in Management of the commissioning of industrial projects, report TMR 8B, Technological Management, University of Bradford, 1981.
15.
International conditions of contract for engineering plant or complete projects have been published by FIDIC (the Fédération Internationale des Ingénieurs-Conseils), by the UN Economic Commission for Europe, and by the UN International Development Organization.
16.
See particularly the recommendations of Economic Development Committees published by the National Economic Development Office.
17.
See BarnesN. M. L. in Control of engineering projects, edited by WearneS. H., 1974, Edward Arnold Ltd.
18.
Health and safety at work, Management Information Sheet 44, 1974, British Institute of Management.
19.
Registration and certification for engineers, Research Note, 1976, Institution of Mechanical Engineers.
20.
Final report of the advisory committee on falsework, Health and Safety Commision, 1975.
21.
PowellP. I.2000 accidents, 1971, National Institute of Industrial Psychology.
22.
NinosG. E.WearneS. H. See the reports published by NEDO (see reference 11 above) and also the recommendations in Responsibilities for project control during construction, report No TMR 17, 1984, Technological Management, University of Bradford.
23.
CartwrightP. A.WearneS. H.Health and safety legislation and engineers, Proc. Instn Mech. Engrs, to be published.
24.
Guidance on the preparation, submission and consideration of tenders for civil engineering contracts recommended for use in the UK, 1983, Institution of Civil Engineers.