The amount of plant needed to meet the load in an electric utility is very dependent on the forced outage rates. In a utility that presently experiences high forced outage rates, there is a danger that future plans will use such high figures. The correct approach is to launch an attack on present forced outages, reduce them to figures comparable with best world figures and plan the forward plant programme on that assumption. This paper describes such a programme in some detail.