The paper describes the preparation for, and current practice of, daily intermittent, or ‘two-shift’, operation of large modern oil-fired 500 MW generating units by the South Western Region of the Central Electricity Generating Board at Fawley and Pembroke 2000 MW power stations.
Get full access to this article
View all access options for this article.
References
1.
PluckM.Control of large oil-fired boilers. Control, Jan. 1968.
2.
MoranF.Developments in the control of power station plant. Making steam plant pay, Instn. Mech. Engrs. Convention, May 1979, pp 141–150.
3.
EntwhistleOakfieldA high level interactive software system for real time multiprocessor applications. Conference on Distributed Computer Control Systems, University of Aston, 1977, IEE Conference Publication No. 153.
4.
WallaceJ. N.Design concepts and experience in the application of distributed computing to the control of large CEGB power stations. IAEA specialist meeting on Distributed Systems of Nuclear Power Plants, May 1980.
5.
GottH. H.BerridgeD. R.Designing a large power station at Fawley. Organisation for design, Instn. Mech. Engrs. Conference, Nov. 1964.
6.
BelchR.AlexanderC. E.WinchK.Computer control at Fawley. Electronics and Power, May 1969, IEE.
7.
BinneyM. F.BeecheyM. A.ShanklandJ. P.WatkinsE. V. D.Control equipment systems design in the United Kingdom power industry. Instn Mech. Engrs conference, Jan. 1971.
8.
JohnsonE. B.Automation of large thermal power stations. Modern steam plant practice, Instn Mech. Engrs Convention, Netherlands, April 1971.
9.
WrightW.AlexanderC. E.Computers in power system operation and control. Computer control at Fawley power station. IEE, May 1972.
10.
OsbornJ. H.TessonA. R.WrightW.AlexanderC. E.Boiler/turbine computer control at Fawley power station. American Institute of Electrical and Electronic Engineers, 1975.
11.
RogersF.WrightW.Two-shifting of 500 MW generator units at Fiddler's Ferry and Fawley power stations. Electrical Review, Feb. 1977.
12.
RogersF.Two-shift operation of CEGB 500 MW steam turbines. Making steam plant pay, Instn Mech. Engrs Convention, May 1979, pp 49–54.
13.
WeathersonJ.Designing large turbine units for two-shift loading. Electrical Times, 1 June 1979.
14.
CharlishG.Digits control the megawatts at Drax. Financial Times, 9 Feb. 1981.
15.
WaltonA.HamP. A. L.Microprocessor applications in turbine-generator instrumentation and control. Direct digital control for power plant, Instn. Mech. Engrs. Conference, Oct. 1982.