Abstract
This paper sets out an assessment of the value and practicality of the construction of fossil fired generating plant designed and built as single units and includes a proposal for the design and layout of a single unit designed to maximize the benefits derived from this concept.
The conclusion is that an acceptable design of power plant, based on the construction of single 600 MW units, can be developed for the UK system which could prove to be advantageous in construction time, in capital cost and in running cost. The layout applies equally effectively to large ‘green field’ sites or for replanting existing stations; in addition, the plant can be replicated in detail and thereby reduce design and engineering costs. Finally the layout can also be applied in principle to smaller units for overseas utilities as required by their system developments.