Abstract
The plant features involved in the regulation of feed water on 500-MW units currently being installed by the C.E.G.B. are outlined and the control requirements relating to this regulation considered. Methods of meeting these requirements in the units to be installed at Fawley Generating Station are described and the operation of the control scheme during the start-up and shut-down of the unit is also covered.
Get full access to this article
View all access options for this article.
