PowellE. M.‘Engineering the Eddystone steam generator for 5000 lb/in2, 1200°F steam’, Trans. Amer. Soc. mech. Engrs August 1957, 1447.
4.
BlumbergH. S.‘Metallurgical considerations of main steam piping for high temperature, high pressure service’, Trans. Amer. Soc. mech. Engrs August 1957, 1377.
5.
HornschurchH.‘Boiler feed pumps for 6500 lb/in2 discharge pressure’, Proc. Amer. Power Conf., 195719, 321.
6.
UlmerR. C.GrabowskiH. A.PattersonR. C.‘Water-treatment, corrosion, and internal-deposit studies for Eddystone’, A.S.M.E. J. Engng Power October 1960, 264.
7.
ChapmanE. C.LorentzR. E.Jr.‘The selection of materials and fabricating techniques for the Eddystone boiler and Sulzer control valves’, A.S.M.E. J. Engng Power October 1960, 275.
8.
TrumplerW. E.JrLeBretonA. F.FoxE. A.WilliamsonR. B.‘Development associated with the superpressure turbine for Eddystone Station Unit No. 1’, A.S.M.E. J. Engng Power October 1960, 286.
9.
CaugheyR. H.BenzW. G.Jr.‘Material selection and fabrication, main steam piping for Eddystone No. 1, 1200°F and 5000 lb/in2 service’, A.S.M.E. J. Engng Power October 1960, 293.
10.
GilkesonR. F.HankinsJ. L.‘Eddystone Station operating experience’, A Report to the Pennsylvania Electric Association, Prime Movers Committee, in Philadelphia on May 11, 1961.
11.
ClarkC. L.RutherfordJ. J. B.WilderA. B.CordoniM. A.‘Metallurgical evaluation of superheater-tube alloys after six months exposure at temperatures of 1100° to 1500°F’, A.S.M.E. J. Engng Power January 1960, 35.
12.
SedorP.DiehlE. K.BarnhartD. H.‘External corrosion in superheaters in boilers firing high-alkali coals’, A.S.M.E.J. Engng Power July 1960, 181.
13.
NelsonWhartonCainCarlJr.‘Corrosion of superheaters and reheaters of pulverized coal fired boilers’, A.S.M.E.J. Engng Power July 1960, 194.
14.
CainCarlJr.NelsonWharton‘Corrosion of superheaters and reheaters of pulverized coal fired boilers, II’, presented before Annual Meeting Amer. Soc. mech. Engrs, 27 November-2 December 1960.
15.
WiedersumGeorge C.Jr.‘A test to anticipate the performance of steam piping at 5000 lb/in2 and 1200°F’, presented before Annual Meeting Amer. Soc. mech. Engrs, December 1959.
16.
FrankenbergT. T.LloydA. G.MorrisE. B.‘The second year of operating experience with the Philo supercritical pressure unit’, Proc. Amer. Power Conf.195921, 169.
17.
GillNeil F.FlackNewton D. ‘Initial operation of Avon No. 8. A supercritical plant’, presented before Amer. Power Conf., 1961.