The role of rapid changeover in today's manufacturing environment is widely acknowledged. Tools to improve changeovers—typically Shingo's ‘SMED’ methodology—are well known. However, little work has been done to establish whether changeover gains have been sustained in differing industrial environments once initial improvement has been achieved. This paper investigates sustaining changeover improvement, investigating factors that contribute to this outcome.
BirkenfeldJ.Correspondence to University of Bath research team (manufacturing engineer, US industry), 2001.
3.
McNiffJ.Action Research, Principles and Practice, 1992 (Routledge, New York).
4.
DaleB. G.BoadenR. J.WilcoxM.McQuaterR. E.Total quality management sustaining audit tool: Description and use. Total Quality Managmt, 1997, 8(6), 395–408.
5.
McintoshR.The impact of innovative design on fast tool change methodologies. PhD thesis, University of Bath, 1998.
6.
PfefferJ.SuttonR. I.The Knowing-Doing Gap: How Smart Companies Turn Knowledge into Action, 2000 (Harvard Business School Press, Boston, Massachusetts).
7.
OliverN.WilkinsonB.The Japanization of British Industry, 1988 (Blackwell, Oxford).
8.
RobbinsH.FinteyM.Why Change Doesn't Work: Why Initiatives Go Wrong and How to Try Again–and Succeed, 1997 (Orion, London).
9.
ShapiroE. C.Fad Surfing in the Boardroom, 1995 (Capstone, Oxford).
MurrayM.Mentoring is performance improvement. Performance Improvement J., 1998, 37(2), 35–39.
12.
LeeD.Set-up reduction: Making JIT work. Managmt Services, May 1986, 8–13.
13.
SuzakiK.The New Manufacturing Challenge: Techniques for Continuous Improvement, 1987 (Free Press, New York).
14.
ClaunchJ.Set-up Time Reduction, 1996 (Irwin Professional, Burr Ridge, Illinois).
15.
TickleS.People power: The secret weapon to high speed changeover. In IMechE Conference on Rapid Changeover of Food Production Lines, London, 13 December 2001.
16.
WillatsP.Meeting with McKinsey and Company, Production Systems Design Centre, Stratford-upon-Avon, September 2000.
WillmottP. Meeting with WCS Consultants, Bath, February 2001.
19.
MacdonaldA.SadlerR.Rapid changeover: Making it happen. In IMechE Conference on Rapid Changeover of Food Production Lines, London, 13 December 2001.
20.
DewhurstC.Eliminating waste: Set-up time reduction (Seminar conducted at National Exhibition Centre, Birmingham, November 2001), Smallpiece Enterprises Limited, Leamington Spa.
21.
McIntoshR.CulleyS.MilehamA.OwenG.An assessment of the role of design in the improvement of changeover performance. Int. J. Ops Prod. Managmt, 1996, 16(9), 5–22.
22.
FengC.-X.KusiakA.HuangC.-C.Scheduling models for set-up reduction. Trans. ASME, J. Mfg Sci. Engng, 1997, 119(4A), 571–579.
23.
JenkinsR.Quick die changing. In Conference on Leading Edge Strategies for the Metalforming Industry (Metalform 1995), Chicago, Illinois, 12–15 March 1995, Ch. 75, pp. 435–450.
ZunkerG.Fifty percent reduction in changeover without capital expenditures. In PMA Technical Symposium Proceedings for the Metal Forming Industry, Chicago, Illinois, 1995, pp. 465–476.
26.
ShingoS.A Revolution in Manufacturing: The SMED System, 1985 (Productivity Press, Cambridge, Massachusetts).
27.
Anon. Nicht nur, um zeit zu sparen. Plastverarbeiter, 1988, 39(5), 148–149.
28.
IafrateA.Quick die change concepts. Sheet Metal Industries, March 1993, 22–23.
29.
RuffleyD. W.Clamping down on productivity. Mach. Des., 23 April 1993, 70–74.
30.
RawlinsonM.WellsP.Taylorism, lean production and the automobile industry. In Beyond Japanese Management: The End of Modern Times? (Ed. StewartP.), 1996, pp. 189–204 (Frank Cass, London).
31.
SmithD. A.Quick Die Change, 1991 (SME, Dearborn, Michigan).
32.
SladkyR.Achieving faster, more efficient tube mill change-overs. TPJ–The Tube and Pipe J., 2001, 9(4), 28–31.
33.
PatelS.ShawP.DaleB. G.Set-up time reduction and mistake proofing methods. Business Process Managmt J., 2001, 7(1), 66–75.
34.
HerrmannJ. W.MinisI.LinE.SchneiderP.An operator information system for parallel, off-line assembly. In Proceedings of Emerging Technologies and Factory Automation (ETFA), 1997, pp. 143–148 (IEEE, Picataway, New Jersey).
35.
CarlsonJ. G.YaoA. C.GirouardW. F.The role of master kits in assembly operations. Int. J. Prod. Economics, 1994, 35, 253–258.
36.
McIntoshR. I.CulleyS. J.MilehamA. R.OwenG. W.A critical evaluation of Shingo's ‘SMED’ (single minute exchange of die) methodology. Int. J. Prod. Res., 2000, 38, 2377–2395.
37.
Rover Group Limited, Triaxis press (promotional publication), Swindon, 1991.
38.
GestG. B.The modelling of changeoversand the classification of changeover time reduction techniques. PhD thesis, University of Bath, 1995.
TrevinoJ.HurleyB. J.FriedrichW.A mathematical model for the economic justification of setup time reduction. Int. J. Prod. Res., 1993, 31(1), 191–202.
43.
EldridgeC.MilehamA. R.CulleyS. J.OwenG. W.NewnesL. B.Run-up: The hidden cost of changeover. In IMechE Conference on Rapid Changeover of Food Production Lines, London, 13 December 2001.
44.
AllahverdiA.GuptaJ. N. D.AldowaisanT.A review of scheduling research involving set-up considerations. Omega, 1999, 27(2), 219–240.
WomackJ. P.JonesD. T.RoosD.The Machine that Changed the World, 1990 (Rawson Associates, New York).
47.
RendellJ.Stop the presses. Automot. World, May 2000, 50–54.
48.
HughesD.HobbsS.SMED–assessing the cost effectiveness of set-up reduction. In Proceedings of 27th International Symposium on Automotive Technology and Automation, Aachen, Germany, 31 October-4 November 1994, pp. 601–607.
49.
NunnR. E.EichhornK. H.Quick mold change–manufacturing flexibility for injection molding. In Proceedings of Conference on Injection Molding–The Next Five Years, Pittsburgh, Pennsylvania, 1985, pp. 67–81.