In this paper, a mixed integer programming model for solving the short term planning problem in surface mining is presented. This model will establish the sequence of mining for a period ranging from days to several months. This involves determining which blocks of the geological model will be extracted and in what order, indicating the movement of the shovels and meeting the production capacity of equipment. To reduce the computation time, four sets of strategies are proposed.
AlarieS, GamacheM.2002. Overview of solution strategies used in truck dispatching systems for open pit mines, Int. J. Surf. Min. Reclam. Env., 16, (1), 59–76.
2.
Albareda-SambolaM, FernándezE, LaporteG.2009. The capacity and distance constrained plant location problem, Comput. Oper. Res., 36, (2), 597–611.
3.
BjorndalaT, HerrerobI, NewmanA., RomerodC., WeintraubA.2011. Operations research in the natural resource industry, Int. Trans. Oper. Res., 1–24.
4.
BleyA, BolandN, FrickeC, FroylandG.2010. A strengthened formulation and cutting planes for the open pit mine production scheduling problem, Comput. Oper. Res., 37, (9), 1641–1647.
5.
CaccettaL, HillS.P. 2003. An application of branch and cut to open pit mine scheduling, J. Global Opt., 27, (2–3), 349–365.
6.
EivazyH, Askari-NasabH.2012. A mixed integer linear programming model for short-term open pit mine production scheduling, Min. Technol., 121, (2), 97–108.
7.
FioroniMM, FranzeseLAG, BianchiTJ, EzawaL, PintoLR, MirandaG.2008. Concurrent simulation and optimization models for mining planning, Proc. 2008 Winter Simulation Conf., (ed. S. J. Mason et al.).
8.
KumralM, DowdPA. 2002. Short-term mine production scheduling for industrial minerals using multi-objective simulated annealing, Proc. 30th Int. Symp. on ‘Application of computers and operations research in the mineral industry (APCOM)’, Fairbanks, AK, USA.
9.
LestageP, MottolaL, ScherrerR, SoumisF.1993. A computerized tool for short range production planning at Mount Wright, Proc APCOM XXIV, 2, 67–74.
10.
LiaoCJ. 1994. A new node selection strategy in the branch-and-bound procedure, Comput. OR (COR), 21, (10), 1095–1101.
11.
MoralesC, RubioE.2009. Development of a mathematical programming model to support the planning of short-term mining, Proc. 34th Int. Symp. on ‘Application of computers and operations research in the mineral industry (APCOM)’, Vancouver, Canada.
12.
NehringM, TopalE, KnightsP.2010. Dynamic short term production scheduling and machine allocation in underground mining using mathematical programming, IMM Trans. A: Min. Technol., 119, (4)212–220.
13.
NewmanAM, RubioE, CaroR, WeintraubA.2010. A review of operations research in mine planning, Interfaces, 40, (3), 222–245.
14.
PryorJ, ChinneckJW. 2011. Faster integer-feasibility in mixed-integer linear programs by branching to force change, Comput. OR (COR), 38, (8), 1143–1152.
15.
SmithML. 1998. Optimizing short-term production schedules in surface mining: integrating mine modeling software with ANIPL/CPLEX, Int. J. Surf. Min. Reclam. Environ., 12, (4), 149–155.