BinksM, WemyssP. 2012. Fosterville gold mine heated leach process, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 121, 224–227.
2.
ChapmanN, PrinceK, EvansP, RadkeF, HaywardP, LesterN. 2010. Identifying gold losses through application of SIMS technology, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 119, 242–246.
3.
DunneR, BudaK, HillM, StauntonW, Wardell-JohnsonG, TiandrawamV. 2012. Assessment of options for economic processing of preg-robbing gold ores, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 121, 217–223.
4.
GoodallWR, ButcherAR. 2012. The use of QEMSCAN in practical gold deportment studies, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 121, 199–204.
5.
HewittD, BreuerP, JeffreyC. 2012. Cyanide detoxification of gold cyanidation tails and process streams, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 121, 228–236.
6.
HolderR. 2012. Optimisation of processing at the Beaconsfield Gold Mine, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 121, 190–198.
7.
ReithF, ZammitCM, RogersSL, McPhailDC, BruggerJ. 2012. Potential utilisation of micro-organisms in gold processing – a review, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 121, 251–260.
8.
SaranrittichaiW, NiyomjindaK, EtschmannB. 2004. Improvements in the cyanide reduction process at Chatree Gold Mine, Proc. Conf. on ‘Metallurgical plant design and operating strategies (MetPlant 2004)’, Perth, WA, Australia, September 2004, AusIMM, 413–421.
9.
StewartPSB. 2010a. Editorial, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 119, 183.
10.
StewartPSB. 2010b. Variation in apparent recovery in CIL/CIP plants, Part 1 – The effect of delay and mixing in the tanks, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 119, 223–227.
11.
StewartPSB. 2010 c. Variation in apparent recovery in CIL/CIP plants, Part 2 – Model limitations, operating parameters and ore properties, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 119, 228–234.
12.
StewartPSB. 2012a. Insights from simulation of a CIL/CIP circuit, Part 1 – model development, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 121, 237–241.
13.
StewartPSB. 2012b. Insights from simulation of a CIL/CIP circuit, Part 2 – simulation studies, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 121, 242–250.
14.
SubasingheN. 2012. Performance curve approach to optimising fluidising water for Knelson concentrators, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 121, 205–210.
15.
WoodG, RivettT, FlemingR, LumsdenB. 2012. Improving fine copper and gold flotation recovery – a plant evaluation, Min. Process. Extract. Metall. (Trans. Inst. Min. Metall. C), 121, 211–216.