AdnerR. (2017). Ecosystem as structure: An actionable construct for strategy. Journal of Management, 43(1), 39–58.
2.
AutioE.ThomasL. (2014). Innovation ecosystems. 204–288. In DodgsonM.GannD. M.PhillipsN. (Eds.), The Oxford handbook of innovation management. Oxford, UK: Oxford University Press.
3.
Baden-FullerC.MorganM. S. (2010). Business models as models. Long Range Planning, 43(2–3), 156–171.
4.
BarlowJ. (2000). Innovation and learning in complex offshore construction projects. Research Policy, 29, 973–989.
5.
BarlowJ.ChoenM.JashaparaA. (1997). Towards positive partnering: Revealing the realities in the construction industry. Bristol, UK: Policy Press.
6.
BellD. (1973). The coming of post-industrial society: A venture in social forecasting. New York, NY: Basic Books.
7.
BiesenthalC.CleggS.MahalingamA.SankaranS. (2018). Applying institutional theories to managing megaprojects. International Journal of Project Management, 36(1), 43–54.
8.
BradyT.DaviesA. (2014). Managing structural and dynamic complexity: A tale of two projects. Project Management Journal, 45(4), 21–38.
9.
BresnenM.MarshallN. (2000). Partnering in construction: A critical review of issues, problems and dilemmas. Construction Management and Economics, 18(2), 229–237.
10.
BuckM. (2017). Crossrail project: Finance, funding and value capture for London’s Elizabeth line. Proceedings of the Institution of Civil Engineers–Civil Engineering, 170(6), 15–22.
11.
Bult-SpieringM.DewulfG. (2008). Strategic issues in public-private partnerships: An international perspective. Oxford, UK: Wiley.
12.
Casadesus-MasanellR.RicartJ. (2010). From strategy to business models and onto tactics. Long Range Planning, 43, 195–215.
13.
ChandlerA. J. (1977). The visible hand: The managerial revolution in American business. Boston, MA: Harvard University Press.
14.
DaviesA. (2017). Projects: A very short introduction. Oxford, UK: Oxford University Press.
15.
DaviesA.GannD.DouglasT. (2009). Innovation in megaprojects: Systems integration at London Heathrow Terminal 5. California Management Review, 51(2), 101–125.
16.
DaviesA.MacAulayS.DeBarroT.ThurstonM. (2014). Making innovation happen in a megaproject: London’s Crossrail suburban railway system. Project Management Journal, 45(6), 25–37.
17.
DaviesA.MackenzieI. (2014). Project complexity and systems integration: Constructing the London 2012 Olympics and Paralympics Games. International Journal of Project Management, 32(5), 773–790.
18.
DaviesA.DodgsonM.GannD. (2016). Dynamic capabilities in complex projects: The case of London Heathrow Terminal 5 (Special issue: Innovation and project management: bridging contemporary trends in theory and practice). Project Management Journal, 47(2), 26–46.
19.
DaviesA.DodgsonM.GannD.MacAulayS. (2017). Five rules for managing large, complex projects. MIT Sloan Management Review, 59(1), 73–78.
20.
DeBarroT.MacAulayS.DaviesA.WolstenholmeA.GannD.PeltonJ. (2015). Mantra to method: Lessons from managing innovation on Crossrail. Proceedings of the Institute of Civil Engineers, 168(4), 171–178.
21.
De NeufvilleR.ScholtesS. (2011). Flexibility in engineering design. Cambridge, MA: MIT Press.
22.
DodgsonM.GannD.MacAulayS.DaviesA. (2015). Innovation strategy in new transportation systems: The case of Crossrail. Transportation Research Part A: Policy and Practice, 77, 261–275.
23.
EganJ. (1998). Rethinking construction: The report of the construction industry task force. Department of Transport, Environment and Regions, London, England.
24.
FloricelS.MillerR. (2001). Strategizing for anticipated risks and turbulence in large-scale engineering projects. International Journal of Project Management, 19, 445–455.
25.
FlyvbjergB. (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3), 5–15.
26.
FlyvbjergB. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19.
27.
FlyvbjergB. (2016). The fallacy of beneficial ignorance: A test of Hirschman’s hiding hand. World Development, 84, 176–189.
28.
FlyvbjergB.AnsarA.BudzierA.BuhlS.CantarelliC.GarbuioM.…MolinE. (2018). Five things you should know about cost overrun. Transportation Research Part A: Policy and Practice, 118, 174–190.
29.
FlyvbjergBBruzeliusN.RothengatterW. (2003). Megaprojects and risk: An anatomy of ambition. Cambridge, UK: Cambridge University Press.
30.
FlyvbjergB.GarbuioM.LovalloD. (2009). Delusion and deception in large infrastructure projects: Two models for explaining and preventing executive disaster. California Management Review, 51(2), 170–193.
31.
GannD. M.SalterA.DodgsonM.PhillipsN. (2012). Inside the world of the project baron. MIT Sloan Management Review, 53(3), 63–71.
32.
GilN. (2007). On the value of project safeguards: Embedding real options in complex products and systems. Research Policy, 36(7), 980–999.
33.
GilN. (2009). Developing project client-supplier cooperative relationships: How much to expect from relational contracts?California Management Review, 51(2), 144–169.
34.
GilN.BeckmanS. (2009). Infrastructure meets business: Building new bridges, mending old ones. California Management Review, 51(2), 6–29.
35.
GilN.TetherB. S. (2011). Project risk management and design flexibility: Analysing a case and conditions of complementarity. Research Policy, 40(3), 415–428.
36.
GilN.PintoJ. K. (2018). Polycentric organizing and performance: A contingency model and evidence from megaproject planning in the UK. Research Policy, 47(4), 717–734.
37.
GrabherG.ThielJ. (2015). Projects, people, professions: Trajectories of learning through a mega-event (the London 2012 case). Geoforum, 65, 328–337.
38.
HeniszW. J. (2002). The institutional environment for infrastructure investment. Industrial and Corporate Change, 11(2), 355–389.
39.
HeniszW. J.LevittR. E.ScottW. R. (2012). Toward a unified theory of project governance: Economic, sociological and psychological supports for relational contracting. Engineering Project Organization Journal, 2(1–2), 37–55.
KivlenieceI.QuelinB. V. (2012). Public-private ties a private actor’s perspective. Academy of Management Review, 37, 272–299.
44.
KwakY. H.ChihY.IbbsC. W. (2009). Towards a comprehensive understanding of public private partnerships for infrastructure development. California Management Review, 51(2), 51–78.
45.
LahdenperäP. (2012). Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(1), 57–79.
46.
LenfleS.LochC. (2010). Lost roots: How project management came to emphasize control over flexibility and novelty. California Management Review, 53(1), 32–55.
47.
LevittR. E. (2011). Towards project management 2.0. Engineering Project Organization Journal, 1(3), 197–210.
48.
LevittR. E.ScottR. W.GarvinM. J. (2019). Public-private partnerships for infrastructure development: Finance, stakeholder alignment, governance. Oxford, UK: Edward Elgar.
49.
LoveP. E. D.MistryD.DavisP. R. (2010). Price competitive alliance projects: Identification of success factors for public clients. Journal of Construction Engineering and Management, 13(6), 947–956.
50.
LoveP. E. D.Ahiaga-DagbuiD. D. (2018). Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects. Transportation Research Part A: Policy and Practice, 113, 357–368.
51.
LundinR. A.SöderholmA. (1995). A theory of the temporary organization. Scandinavian Journal of Management, 11(4), 437–455.
52.
MahalingamA. (2009). PPP experiences in Indian cities: Barriers, enablers, and the way forward. Journal of Construction Engineering and Management, 136(4), 419–429.
53.
MangematinV.Baden-FullerC. (2015). Introduction: Business models and modelling business models. In Baden-FullerC.MangematinV. (Eds.), Business models and modelling (Advances in Strategic Management) (Vol. 33, pp. xi–xxii). Bingley, England: Emerald Group Publishing Limited.
54.
MerrowE. W. (2011). Industrial megaprojects: Concepts, strategies and practices for success. Hoboken, NJ: John Wiley & Sons.
55.
MillerR.LessardD. (2001). Understanding and managing risks in large engineering projects. International Journal of Project Management, 19(8), 437–443.
56.
MorrisP. W. G.HoughG. H. (1987). The anatomy of major projects—A study of the reality of project management. Chichester, UK: John Wiley & Sons Ltd.
57.
MorrisP. W. G. (1994). The management of projects. London, England: Thomas Telford.
58.
MorrisP. W. G. (2013). Reconstructing project management. Hoboken, NJ: John Wiley & Sons.
59.
NAO. (2003). PFI: Construction performance. Report by the Comptroller and Auditor General, HC 371, Session 2002–2003, National Audit Office, London, England.
60.
NAO. (2005). Improving public services through better construction. Report by the Comptroller and Auditor General, HC 364-II, Session 2004–2005, National Audit Office, London, England.
61.
NelsonR. R.WinterS. G. (1982). An evolutionary theory of economic change. Cambridge, MA: Harvard University Press.
62.
OrrR. J.ScottR. W.LevittR. E.ArttoK.KujalaJ. (2011). Global projects: Distinguishing features, drivers, and challenges. In ScottW. R.LevittR. E.OrrR. J. (Eds.), Global projects: Institutional and political challenges (pp. 15–51). Cambridge, UK: Cambridge University Press.
63.
RaoH.KenneyM. (2008). New forms as settlements. In GreenwoodR.OliverC.SuddabyR.Sahlin-AnderssonK. (Eds.), The Sage handbook of organizational institutionalism (pp. 352–370). London, England: Sage Publications.
64.
RossJ.StawB. (1993). Organizational escalation and exit: Lessons from the Shoreham Nuclear Power Plant. Academy of Management Journal, 36(4), 701–732.
65.
ScottW. R.LevittR. E.OrrR. J. (2011). Global projects: Institutional and political challenges. Cambridge, UK: Cambridge University Press.
66.
ShenharA.DvirD. (2007). Reinventing project management: The diamond approach to successful growth and innovation. Boston, MA: Harvard Business School Publishing.
67.
SydowJ.LindkvistL.DeFillippiR. (2004). Project-based organizations, embeddedness and repositories of knowledge: Editorial. Organization Studies, 25(9), 1475–1489.
68.
TeeR.DaviesA.WhyteJ. (2019). Modular designs and integrating practices: Managing collaboration through coordination and cooperation. Research Policy, 48(1), 51–61.
69.
WalkerD. H. T.Lloyd-WalkerB. M. (2014). The ambience of a project alliance in Australia. Engineering Project Organization Journal, 4(1), 2–16.
70.
WhyteJ. (2011). Managing digital coordination of design: Emerging hybrid practices in an institutionalized project setting. Engineering Project Organization Journal, 1(3), 159–168.
71.
WilliamsT.SamsetK. (2010). Issues in front-end decision making on projects. Project Management Journal, 41(2), 38–49.
72.
WilliamsonO. E. (1991). Comparative economic organization: The analysis of discrete structural alternatives. Administrative Science Quarterly, 36, 269–296.
73.
WinchG. (2014). Three domains of project organizing. International Journal of Project Management, 32, 721–731.
74.
WinchG.LeiringerR. (2016). Owner project capabilities for infrastructure development: A review and development of the “strong owner” concept. International Journal of Project Management, 34(2), 271–281.
75.
WolmarC. (2002). Down the tube: The battle for London’s underground. London, England: Aurum Press.
76.
WolstenholmeA.FugemanI.HammondF. (2008). Heathrow Terminal 5: Delivery strategy. Proceedings of the Institution of Civil Engineers – Civil Engineering, 161(5), 10–15.