A project control system aims to minimize the gap between project planning and project execution in order to achieve project aims, i.e., cost, time, and content. This paper reviews the current literature on project control systems. The first part provides an overview of the nature and importance of project control. The second part deals with current project control tools and techniques, followed by a discussion on the advantages and disadvantages of these systems.
AbbaW. F. (1997). Eared value management: Reconciling government and commercial practices. Program Manager Magazine, 1, 58–63.
2.
AbbasiG. Y., & ArabiatY. A. (2001). A heuristic to maximize the net present value for resource-constrained project scheduling problems. Project Management Journal, 32(2), 17–24.
3.
AkaluM. M. (2001). Re-examining project appraisal and control: Developing a focus on wealth creation. International Journal of Project Management19, 375–383.
4.
ArditiD., TokdemirO. B., & SuhK. (2001). Effect of learning on line-of-balance scheduling. International Journal of Project Management19(5), 265–277.
5.
Association for Project Management. (2000). Project Management Body of Knowledge, APMBoK.UK: Association for Project Management.
6.
AvisonD., BaskervilleR., & MyersM. (2001). Controlling research projects. Information Technology and People14(1), 28–45.
7.
BaccariniD. (1999). The logical framework method for defining project success. Project Management Journal30(4), 25–32.
8.
BauchG. T., & ChungC. A. (2001). A statistical project control tool for engineering managers. Project Management Journal32(2), 37–44.
9.
BaulyJ. (1994). Measures of performance. World Class Design to Manufacture1(3), 37–40.
10.
BergC., & ColensoK. (April 2000). Work breakdown structure practice standard project—WBS vs. activities. PM Network, 12–17.
11.
CicmilS. J. K. (1997). Critical factors of effective project management. The TQM Magazine9(6), 390–396.
12.
CostaR. S., & JardimE. G. M. (1998). Total punctuality approach for the jobbing industry. International Journal of Operations & Production Management18(3), 260–270.
13.
CoteM. J., & DaughertyC. R. (2000). Using project management to improve month end reporting in a hospital. Production and Inventory Management Journal41(4), 17–22.
14.
GlobersonS., & ZwikaelO. (2002). The impact of the project manager on project management planning processes. Project Management Journal33(3), 58–65.
15.
DattaS., & MukherjeeS. K. (2001). Developing a risk management matrix for effective project planning—an empirical study. Project Management Journal32(2), 45–57.
16.
De FalcoM., & MacchiaroliR. (1998). Timing of control activities in project planning. International Journal of Project Management16(1), 51–58.
17.
De ToniA., & TonchiaS. (2001). Performance measurement systems: Models, characteristics and measures. International Journal of Operations and Production Management21(1-2), 46–70.
18.
DrivaH., PawarK. S., & MenoU. (2001). Performance evaluation of new product development from company perspective. Integrated Manufacturing Systems12(5), 368–378.
19.
DengM. Z. M., & HungY. F. (1998). Integrated cost and schedule control: Hong Kong perspective. Project Management Journal29(4), 43–49.
20.
DeyP. K. (2000). Managing project in a fast track: A case study of a public sector organization in India. International Journal of Public Sector Management13(7), 588–609.
21.
DeyP. K. (2001). Decision support system for risk management: A case study. Management Decision39(8), 634–649.
22.
DvirD., RazT., & ShenharA. J. (2003). An empirical analysis of the relationship between project planning and project success. International Journal of Project Management21(2), 89–95.
23.
El-MashalehM. S., & ChaseyA. D. (1999). Improving the cost and schedule control system. Cost Engineering41(7), 39–41.
24.
ElkingtonP., & SmallmanC. (2002). Managing project risks: A case study from the utilities sector. International Journal of Project Management20(1), 49–57.
25.
EvaristoR., & Van FenemaP. C. (1999). A typology of project management: Emergence and evolution of new forms. International Journal of Project Management17(5), 275–282.
26.
FlemingQ. W., & KoppelmanJ. M. (July, 1999). Earned value management: An introduction. The Journal of Defense Software Engineering, 11–14.
27.
FlemingQ. W., & KoppelmanJ. M. (2000). Earned value management project management.Newtown Square, PA: Project Management Institute.
28.
FloricelS., & MillerR. (2001). Strategizing for anticipated risks and turbulence in large-scale engineering projects. International Journal of Project Management19(8), 445–455.
29.
Francis-ElranS. (1998). The effect of project control on project success in the construction industry.Working paper, Technion - Israel Institute of technology.
30.
FrickeS., & ShenharA. J. (2000). Managing multiple engineering projects in a manufacturing support environment. IEEE Transactions on Engineering Management47(2), 258–268.
31.
GoldrattE. (1988). The Goal.Israel: Daniela De Nur Publishers.
32.
GoldrattE. (1997). Critical Chain.Israel: Daniela De Nur Publishers.
33.
GutierrezG., & PaulA. (2000). Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance. Operations Research48(6), 927–938.
34.
HalmanJ. I. M., & BurgerG. T. N. (2002). Evaluating effectiveness of project start-ups: An exploratory study. International Journal of Project Management20(1), 81–89.
35.
HerroelenW., & LeusR. (2001). On the merit and pitfalls of critical chain scheduling. Journal of Operations Management19(5), 559–557.
36.
HerroelenW., LeusR., & DemeulemeesterE. (2002). Critical chain project scheduling: Do not oversimplify. Project Management Journal33(4), 48–60.
37.
HidesM. T., IraniZ., PolychronakisI., & SharpJ. M. (2000). Facilitating total quality through effective project management. International Journal of Quality and Reliability Management17(4-5), 407–422.
38.
HormoziA. M., & DubeL. F. (1999). Establishing project control: Schedule, cost, and quality. Project Management Journal64(1), 32–38.
39.
JiangJ., & KleinG. (2000). Software development risk to project effectiveness. The Journal of System and Software52(1), 3–10.
40.
JiangJ. J., KleinG., & ChenH. (2001). The relative influence of IS project implementation policies and project leadership on eventual outcome. Project Management Journal32(3), 49–55.
41.
KolischR., & PadmanR. (2001). An integrated survey of deterministic project scheduling. Omega, The International Journal of Management Science29(3), 249–272.
42.
KwokK. Y., & RaoV. M. (1998). A quality control and improvement system based on the total control methodology (TCM). International Journal of Quality and Reliability Management15(1), 13–48.
43.
LampelJ. (2001). The core competencies of effective project execution: the challenge of diversity. International Journal of Project Management19(8), 471–483.
44.
LaszioG. P. (1999). Project management: A quality management approach. The TQM Magazine11(3), 157–160.
LingY. Y., & LauB. S. Y. (2002). A case study on the management of the development of a large power plant in East Asia based on design build arrangement. International Journal of Project Management20(6), 413–423.
47.
LoV., & HumphreysP. (2000). Project management benchmarks for SMEs implementing ISO 9000. Benchmarking. An international Journal7(4), 247–259.
MeredithJ. R., & MantelS.Jr. (2003). Project Management - A Managerial Approach.New York: John Wiley & Sons, Inc.
53.
MichalskiL. (2000). Applying the theory of constraint: Managing multiple deadlines. Pharmaceutical Technology24(9), 126–132.
54.
MillerR., & LessardD. (2001). Understanding and managing risk in large engineering projects. International Journal of Project Management19(8), 437–443.
55.
MorrisP. W. G. (2001). Updating the project management bodies of knowledge. Project Management Journal32(3), 21–30.
56.
MotwaniJ., MirchandaniD., MadanM., & GunasekaranA. (2002). Successful implementation of ERP projects: Evidence from two case studies. International Journal of Production Economics75(1-2), 83–96.
57.
NicholasJ. M. (1994). Managing business & engineering projects.New Jersey: Prentice Hall.
58.
OdehA. M., & BattainehH. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management20(1), 67–73.
59.
PaquinJ. P., CouillardJ., & FerrandD. (2001). Assessing and controlling the quality of a project end product: the earned quality method. IEEE Transactions on Engineering Management47(1), 88–97.
60.
PintoJ. K., & SlevinD. P. (1987). Critical factors in successful project implementation. IEEE Transactions on Engineering Management34(1), 22–28.
61.
PintoJ. K. (2000). Understanding the role of politics in successful project management. International Journal of Project Management18(2), 85–91.
62.
Project Management Institute. (2004). A Guide to the Project Management Body of Knowledge (PMBOK® Guide).Newtown Square, PA: Project Management Institute.
63.
RabyM. (2000). Project management via earned value. Work Study49(1), 6–9.
64.
RandG. K. (2000). Critical chain: The theory of constraints applied to project management. International Journal of Project Management18(3), 173–177.
65.
RazT., & ErelE. (2000). Optimal timing of project control points. European Journal of Operational Research127(2), 252–261.
66.
RobinsonP. B. (1997). The performance measurement baseline—A statistical view. Project Management Journal28(2), 47–52.
67.
RozenesS., VitnerG., & SpraggettS. (2004). MPCS: Multidimensional Project Control System. International Journal of Project Management22(2), 109–118.
68.
RozenesS., VitnerG., & SpraggettS. (2003). Measuring efficiency of projects in SME organizations.Proceedings of the Portland International Conference on Management of Engineering and Technology 03.
69.
SadehA., DvirD., & ShenharA. J. (2000). The role of contract type in the success of R&D defense projects under increasing uncertainty. Project Management Journal31(3), 14–22.
70.
SánchesA. M., & PèrezM. P. (2002). R&D project management in Spanish industry. International Journal of Project Management20(7), 545–560.
71.
SchimmollerB. K. (2001). The changing face of project management. Power Engineering105, 28–30.
72.
SchmitR., LyytinenK., KeilM., & CuleP. (2001). Identifying software project risks: An international Delphi study. Journal of Management Information Systems17(4), 5–36.
73.
ShenharA. J. (1998). From theory to practice: Toward a typology of project management styles. IEEE Transactions on Engineering Management45(1), 33–48.
74.
ShenharA. J. (2001). One size does not fit all projects: Exploring classical contingency domains. Management Science47(3), 394–414.
75.
ShtubA. (1997). Project segmentation—A tool for project management. International Journal of Project Management15(1), 15–19.
76.
ShtubA., BardJ., & GlobersonS. (2005). Project Management: Processes, Methodologies, and Economics, 2nded. New York: Prentice Hall.
77.
SipperD., & BufinR. (1997). Production planning, control and integration.New York: McGraw-Hill.
78.
SragenhymE. (2001). Achieving project objectives: Planning problems, uncertainty, human factor influence.Proceeding of the 6th National conference of the ISA, Israel.
79.
SteynH. (2000). An investigation into the fundamentals of critical chain project scheduling. International Journal of Project Management19(6), 363–369.
80.
SteynH. (2002). Project management applications of the theory of constraints beyond critical chain scheduling. International Journal of Project Management20(1), 75–80.
81.
TatikondaM. V., & RosenthalS. R. (2000). Successful execution of a product development projects: Balancing and flexibility in the innovation process. Journal of Operations Management18(4), 401–425.
82.
TukelO. I., & RomW. O. (1998). Analysis of the characteristics of project in diverse industries. Journal of Operations Management16(1), 43–61.
83.
TukelO. I., & RomW. O. (2001). An empirical investigation of project evaluation criteria. International Journal of Operations and Production Management21(3), 400–416.
84.
TummalaV. M. R., & LeungY. H. (1996). A risk management model to access safety and reliability risks. International Journal of Quality and Reliability Management13(8), 53–62.
85.
TurnerJ. R., & KeeganA. (2000). The versatile project based organization governance and operational control. European Management Journal17(3), 296–309.
86.
TurnerJ. R. (2004). Five necessary conditions for project success. International Journal of Project Management22(5), 349–350.
87.
UmbleM., & UmbleE. (2000). Manage your projects for success: an application of the theory of constraints. Production and Inventory Management Journal41(2), 27–31.
88.
U.S. Department of Defense. (1997). Performance Measurement for Selected Acquisitions, DOD 7000.2.Washington, DC: U.S. Department of Defense.
89.
U.S. Department of Defense. (1998). Handbook Work Breakdown Structure, MIL-HDBK-881.Washington, DC: U.S. Department of Defense.
90.
U.S. Department of Defense. (2000). A scheduling guide for program managers.Washington, DC: U.S. Department of Defense.
91.
Van veen DirksP., & WijnM. (2002). Strategic control: Meshing critical success factors with the balanced scorecard. Long Range Planning35(4), 407–427.
92.
WalsemanA. (2001). Juggling schedule, cost and client requirements. Power Engineering, 105(5), 39–42.
93.
WhiteD., & FortuneJ. (2002). Current practice in project management—An empirical study. International Journal of Project Management20(2), 1–11.
94.
WhittakerB. (1999). What went wrong? Unsuccessful information technology projects. Information Management and Computer Security7(1), 23–29.
95.
WilliamsT. M. (1999). The need for new paradigms for complex projects. International Journal of Project Management17(5), 269–273.
96.
WilliamsT. (2003). The contribution of mathematical modeling to the practice of project management. Research paper No. 2003/4, Strathclyde Business School, Glasgow, Scotland.