This paper addresses how to estimate the final cost of a project and when the estimate becomes accurate. The performance of five forecasting models drawn from literature was evaluated with data from a sample of actual projects. A stability analysis was carried out in order to identify when the forecasts become stable and accurate for the model that emerged as the most accurate.
BeachC.P. (1990, November). A-12 administrative inquiry.Navy Memorandum, p. 6.
2.
ChenM.T. (1996, April). An innovative project report.Cost Engineering, 38.
3.
ChristensenD.S., & HeiseS.R. (1993). Cost performance index stability.National Contract Management Association Journal, 25(1).
4.
FlemingQ.W., & KoppelmanJ.M. (1994, November). The essence of evolution of earned value.Cost Engineering, 36(11).
5.
FlemingQ.W., & KoppelmanJ.M. (1995a, May). The earned value body of knowledge.PM Network.
6.
FlemingQ.W., & KoppelmanJ.M. (1995b, October). Reengineering the earned value process: From government into the private sector.Proceedings of the 26th Annual Project Management Institute 1995 Seminars & Symposium, p. 7–12.
7.
FlemingQ.W., & KoppelmanJ.M. (1996, January). Forecasting the final cost and schedule result.PM Network.
8.
ShtubA., BardJ.F., & GlobersonS. (1994). Project management—Engineering, technology and implementation.Prentice Hall, p. 374–497.