GaoHKongDSunY. Reliability modeling and analysis for systems governed by multiple competing failures processes. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 256--265.
2.
ZhangQYuSHanY, et al. Research on the model of a multi-state aggregated Markov repairable system. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 266--276.
3.
NiuCJiangJGeB, et al. Preventive maintenance model based on the renewal-geometric process. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 348--356.
4.
SuPWangG. Reliability analysis of network systems subject to probabilistic propagation failures and failure isolation effects. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 290--306.
5.
NakamuraTYamamotoHAkibaT. Reliability of a toroidal connected-(r,s)-out-of-(m,n):F lattice system. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 329--338.
6.
WangHYWangZQ. A condition-based preventive replacement policy with imperfect manual inspection for a two-stage deterioration process. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 225--236.
7.
MaCWangWCaiZ, et al. Maintenance optimization of reconfigurable systems based on multiobjective Birnbaum importance. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 277--289.
8.
WuGLiZLiuP. Risk-informed reliability improvement optimization for verification and validation planning based on set covering modeling. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 357--370.
9.
WangNZhangHLvR, et al. An investigation of reliability optimization in standby systems. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 237--247.
10.
YangYLiDZhangZ. Estimation of parameters for load-sharing parallel systems under exponential Pareto distribution. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 248--255.
11.
JiangR. A novel parameter estimation method for the Weibull distribution on heavily censored data. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 307--316.
12.
LiuFDuiHLiZ. Reliability analysis for electrical power systems based on importance measures. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 317--328.
13.
HanYJZhaoQQYunWY. Optimal inspection and replacement strategy for 145 kV gas-insulated switchgear. Proc IMechE, Part O: J Risk and Reliability2022; 236(2): 339--347.