This report summarizes the work to date on a simulator qualification methodology project. The development of a simulator qualification process, based on a training perspective, is described so that it can be used in other qualification projects. The measures used to quantify the simulator's performance are provided and the results of demonstration analysis are described.
Get full access to this article
View all access options for this article.
References
1.
American National Standards Institute, “Nuclear Power Plant Simulators for Use in Operator Training,” ANSI/ANS-3.5, 1981.
2.
HaysR. T., “Simulator Fidelity: A Concept Paper,” Technical Report 490, U. S. Army Research Institute for the Behavioral and Social Science (ARI), Alexandria, VA, November, 1980.
3.
Van CottH. P.KinkadeR. G., Human Engineering Guide to Equipment Design, American Institute for Research, Washington, DC, L. C. 72–600054, 1972.
4.
NRC Guide 1.97 Rev. 2, Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident..
5.
A Parameter Set for a Nuclear Plant Safety Console, Nuclear Safety Analysis Center 10, November, 1980.
6.
Fundamental Safety Parameter Set for Boiling Water Reactors, Nuclear Safety Analysis Center 21, December 1980.
7.
KozinskyE. J.PackR. W., “Performance Measurement Systems for Training Simulators,” Electric Power Reserach Insitute-Reserach Project 769, EPRI-NP 2719, November, 1982.