Abstract
This study was an initial examination of controllers' ability to manage Global Positioning System outage situations caused by intentional/unintentional radio frequency interference. Twenty-seven certified professional air traffic controllers staffed their on-the-job sectors that were emulated on a high fidelity platform. Three navigational system outage conditions were simulated: no outage, partial outage, and full outage. Three operational environments were also simulated: a current environment, a future avionics equipage environment, and a future avionics equipage environment with ground based navigation aid reductions. The research team collected coordination, task effectiveness measures, and real-time subjective workload ratings. Results indicated the controllers had significant increases in workload and coordination activities due to outages; however, no differences in task effectiveness measures emerged. The overall conclusion made in this study is that although there was a significant effect of outage on workload, controllers were generally able to compensate for the increase. The operational environment was inconsequential.
Get full access to this article
View all access options for this article.
