Automatic scheduling was compared with man/computer interactive scheduling for a simulated job shop in experimental sessions. Factors of the job stream were controlled and those factors which contributed to improved man/computer scheduling versus automatic scheduling were identified. Results show that man/computer scheduling generally was superior to automatic scheduling; very significantly in several job stream situations but in one situation the automatic method was best.
Get full access to this article
View all access options for this article.
References
1.
AlfordE.C.BuckJ.R., “A Unit Task Simulator for Off-Line Evaluation of Man/Computer Interfaces”, Proc. 6th Congress Intl. Ergonomics Assoc., Univ. of Maryland, 1976.
2.
AndersonV.L.McLeanR.A., Design of Experiments - A Realistic Approach, Marcel Dekker, Inc., N.Y., 1974.
3.
BakerC.T.CzielinskiB.P., “Simulation of a Simplified Job Shop”, Mgt. Sci., v. 6, n. 3, April 1960.
4.
BellT.E., “Graphical Analysis Procedures for Simulation and Scheduling”, Unpublished Ph.D. Dissertation, Univ. of Ca., Los Angeles, 1968.
5.
BowmanE.H., “The Schedule Sequencing Problem”, Operations Research, v. 7, n. 5, 1959.
6.
BrooksG.H.WhiteC.B., “An Algorithm for Finding Optimal or Near Optimal Solutions to the Production Scheduling Problems”, J. of Ind. Eng., v. 16, n. 1, 1965.
7.
BuckJ.R.HancockW.M., “Manual Optimization of Ill-Structured Problems”, Proc. Human Factors Soc., Dallas, Texas, 1975.
8.
ConnerJ.I., “A Heuristic Method for Solving Job Shop Sequencing Problems”, Prod. & Inv. Mgt., v. 13, n. 5, 1972.
9.
ConwayR.W., “Priority Dispatching and Work In-Process Inventory in a Job Shop”, J. of Ind. Eng., v. 16, n. 2, 1965.
10.
ConwayR.W.MaxwellW.L.MillerL.W., Theory of Scheduling, Addison-Wesley Pub. Co., Reading, Massachusetts, 1967.
11.
CrawleyJ.E., “Simulation Studies of Interface Design”, Interfaces with the Process Control Computer - The Operator, Engineering and Management, WilliamsT.J., Ed., Purdue University, August 3–6, 1971.
12.
CrabillT.B., “A Lower Bound Approach to the Scheduling Problem”, Research Report, Dept. of Ind. Eng., Cornell Univ., 1964.
13.
FurgusonR.L.JonesC.H., “A Computer Aided Decision System”, Mgt. Sci., v. 15, n. 10, 1969.
14.
GereW.S.Jr., “Heuristics in Job Shop Sch Scheduling”, Mgt. Sci., v. 14, n. 3, 1966.
15.
GodinV.B.JonesC.H., “The Interactive Shop Supervisor”, J. of Ind. Eng., v. 1, no. 11, 1969.
16.
HollowayC.A.NelsonR.T., “Alternative Formulation of the Job Shop Problem with Due Dates”, Mgt. Sci., v. 20, n. 1, 1973.
17.
HaiderS.W.MoodieC.L.BuckJ.R., “An Investigation of Man/Computer Interaction Versus An Automatic Heuristic in Scheduling Job Shops”, Purdue Laboratory for Applied Industrial Control, Report No. 87, West Lafayette, Indiana, October, 1976.
18.
JonesC.H., “A Comparative Study of Decision-Making from Computer Terminals”, Proc. Spring Joint Computer Conference, AFIPS, 1970.
19.
KettinghamP.J.A.O'BrienD.D., “A Simulation Study of Computer-Aided Soaking Pit Scheduling”, in EdwardsE.LeesF. P., Eds., The Human Operator in Process Control, Holsted Press, N.Y., 1974.
20.
LickliderJ.R.C., “Man Computer Symbiosis”, IRE Trans. on Human Factors in Electronics, v. 1, 1961.
21.
ManneA.S., “On the Job Shop Scheduling Problem”, Oper. Res., v. 8, n. 2, 1960.
22.
NicholsonT.A.J.PullenR.D., “A Computer Terminal System for Managing Scheduled Orders through Plants”, in Decision Design and the Computer, Inst. Chem. Eng. Sympos. Series No. 35, London, 1972.
23.
ScriabinM.VerginR.C., “Comparison of Computer Algorithms and Visual Based Methods for Plant Layout”, Mgt. Sci., v. 22, n. 2, 1975.
24.
SmithH.T.CrabtreeR.G., “Interactive Planning: A Study of Computer Aiding in the Execution of a Simulated Scheduling Task”, Intl. J. Man-Machine Studies, v. 7, 1975.
25.
SmithH.T., “Perceptual Organization and the Design of the Man-Computer Interface in Computer Control”, Research Paper, Dept. of Psych., Bradford University, 1977.
26.
WagnerH.M., “An Integer Linear Programming Model for Machine Scheduling”, Naval Research Logistics Quarterly, v. 6, n. 2, 1959.