AminiMTKeshavarzEKeshavarzAet al. (2016) Prioritisation and performance evaluation of employees at strategic human resource management process using fuzzy AHP and fuzzy TOPSIS methods. International Journal of Productivity and Quality Management17(1): 61–81.
2.
BrowningTRYassineAA (2010) Resource-constrained multi-project scheduling: priority rule performance revisited. International Journal of Production Economics126(2): 212–228.
3.
CoatesJFPGodetM (1994) From Anticipation to Action: A Handbook of Strategic Prospective. Paris: UNESCO Publishing.
4.
DreyfusSE (2004) The five-stage model of adult skill acquisition. Bulletin of Science, Technology & Society24(3): 177–181.
5.
DwivediSNPrasadB (2001) Balancing of competitiveness metrics and measures for excellence in manufacturing. In: Proceedings of 2001 ASME international mechanical engineering congress and exposition: IMECE 2001, New York, 11–16 November, vol. 12, pp. 439–448. New York: ASME.
6.
ElarnurAInceMKaratopBet al. (2017) The risk analysis by failure mode and effect analysis (FMEA) and fuzzy-FMEA of supercritical water gasification system used in the sewage sludge treatment. Journal of Environmental Chemical Engineering5(1): 1261–1268.
7.
ElmsalmiMHachichaW (2014) Risk mitigation strategies according to the supply actors’ objectives through MACTOR method. In: 2014 international conference on advanced logistics and transport (ICALT), Hammamet, Tunisia, 1–3 May, pp. 362–367. New York: IEEE.
8.
GirardPRobinV (2006) Analysis of collaboration for project design management. Computers in Industry57(8): 817–826.
9.
GomarJEHaasCTMortonDP (2002) Assignment and allocation optimization of partially multiskilled workforce. Journal of Construction Engineering and Management128(2): 103–109.
10.
GreerCR (2001) Strategic Human Resource management. Fort Worth, TX: Texas Christian University.
11.
GubbiJBuyyaRMarusicSet al. (2013) Internet of things (IoT): a vision, architectural elements, and future directions. Future Generation Computer Systems29(7): 1645–1660.
12.
HarbT (2009) Risk Management Update: ISO 31000 Overview and Implications for Managers. Geneva: International Organization for Standardization.
13.
HepworthAHaltermanKStoneBet al. (2015) An integrated task management system to reduce semantic conflicts in multi-user computer-aided design. Concurrent Engineering23(2): 98–109.
14.
HoodCJonesDK (eds) (2003) Accident and Design: Contemporary Debates on Risk Management. Oxon: Routledge.
ISO 31000:2009 (2009) Risk management – principles and guidelines.
17.
LevinthalDA (2016) Resource allocation and firm boundaries. 43(8): 2580–2587.
18.
McDanielMASchmidtFLHunterJE (1988) Job experience correlates of job performance. Journal of Applied Psychology73(2): 327–330.
19.
MikulakRJMcDermottRBeauregardM (2008) The Basics of FMEA. Boca Raton, FL: CRC Press.
20.
Picos PazosCMOrdoñez LoredoE (2015) The influence of the human resource allocation process on employee satisfaction level: Qualitative research based on ALLEGION – an International Manufacturing plant. Available at: https://www.diva-portal.org/smash/get/diva2:911484/FULLTEXT01.pdf
21.
PrasadB (2001) Towards balancing multiple competitiveness measures for improving business performance in manufacturing. International Journal of Manufacturing Technology and Management3(6): 550–569.
22.
PrasadB (2002) Towards life-cycle measures and metrics for concurrent product development. International Journal of Computer Applications in Technology15(1–3): 1–8.
23.
PurdyG (2010) ISO 31000: 2009 – setting a new standard for risk management. Risk Analysis30(6): 881–886.
RobinVGirardP (2010) An integrated product-process-organisation model to manage design systems. International Journal of Product Development10(4): 318–337.
26.
RobinVRoseBGirardP (2007) Modelling collaborative knowledge to support engineering design project manager. Computers in Industry58(2): 188–198.
27.
SaatyTL (2008) Relative measurement and its generalization in decision making why pairwise comparisons are central in mathematics for the measurement of intangible factors the analytic hierarchy/network process. Revista de la Real Academia de Ciencias Exactas, Fisicas y Naturales, Serie A: Matematicas102(2): 251–318.
28.
SchuhGPotenteTVarandaniRet al. (2014) Collaboration moves productivity to the next level. Procedia CIRP17: 3–8.
29.
ShenMTzengGHLiuDR (2003) Multi-criteria task assignment in workflow management systems. In: Proceedings of the 36th annual Hawaii international conference on system sciences, Big Island, HI, 6–9 January. New York: IEEE.
30.
WarrP (1993) In what circumstances does job performance vary with ages?The European Work and Organizational Psychologist3(3): 237–249.
31.
YanH-SWangZJiangM (2002) A quantitative approach to the process modeling and planning in concurrent engineering. Concurrent Engineering10(2): 97–111.