In today's competitive environment, it is necessary to deliver products on time and within budget. The first step towards achieving this is to have estimation tools that are effective in producing realistic project estimates that become the basis of a project plan. This paper describes a complete quantitative, estimation methodology that can provide initial as well as updated project estimates from feasibility study until completion. Demonstrative examples are presented.
Bounds, G. (November 1998). The last word on project management . IIE Solutions, 41-43.
2.
Norris, K.P. (1971). The accuracy of project cost and duration estimates in industrial R&D. R&D Management, 2(1): 25-36.
3.
Murmann, P.A. (1994). Expected development time reductions in the German mechanical engineering industry. Journal of Product Innovation Management, 11(3): 236-252.
4.
Thamhain, H.J. and Wilemon, D.L. (1986). Criteria for controlling projects according to plan. Project Management Journal , 17(2): 75-81.
5.
Phan, D., Vogel, D. and Nunamaker, J. (1988). The search for perfect project management. Computer world, 22(39): 95-100.
6.
Leech, D.J. (1972). Management of Engineering Design. Belgium: John Wiley & Sons.
7.
Putnam, L.H. (1978). Progress in modeling the software life cycle in a phenomenological way to obtain engineering quality estimates and dynamic control of the process. Second Software Life Cycle Management Workshop . Atlanta, Georgia.
8.
Adrangi, B. and Harrison, W. (1987). Effort estimation in a system development project . Journal of Systems Management, 38(8): 21-23.
9.
Bashir, H.A. and Thomson, V. (1999). Metrics for design projects: A review. Design Studies , 20(3): 262-277.
10.
Conte, S.D., Dunsmore, H.E. and Shen, V.Y. (1986). Software Engineering Metrics and Models . Menlo Park: The Benjamin/Cummings Publishing Company.
11.
Jacome, M.F. and Lapinskii, V. (1997). NREC: Risk assessment and planning of complex designs. IEEE Design and Test of Computers, 14(1): 42-49.
12.
Bashir, H.A. and Thomson, V. (2001). Models for estimating design effort and time. Design Studies , 22(2): 141-155.
13.
Bashir, H.A. and Thomson, V. (2001). An analogy-based model for estimating design effort. Design Studies , 22(2): 157-167.
14.
Walston, C.E. and Felix, C.P. (1977). A method of programming measurement and estimation. IBM System Journal , 16(1): 54-73.
DeMarco, T. (1982). Controlling Software Projects. New York: Yourdon Press.
17.
Wallace, K.M. and Hales, C. (1987). Detailed analysis of an engineering design project. In: Eder, W.E. (ed.), Proceedings of the 1987 International Conference on Engineering Design.
18.
Blessing, L.T.M. (1994). A process-based approach to computer-supported engineering design. Ph.D. Dissertation, University of Twente.
19.
Walverton, R.W. (1974). The Cost Of Developing Large-Scale Software. IEEE Transactions on Computers , 23(6): 615-636.
20.
Hales, C. (1987). Analysis of the engineering design process in an industrial context. Ph.D. Dissertation, University of Cambridge.
21.
Gott, B. (1980). Why can't we manage CAD? In: Proceedings of Conference on Managing Computer Aided Design .
22.
Bashir, H.A. and Thomson, V. (1999). Estimating design complexity . Journal of Engineering Design, 10(3): 247-257.
23.
Norden, P.V. (1970). Useful tools for project management. In: Starr, M.K. (ed.), Management of Production .
24.
Pahl, G. and Beitz, W. (1984). Engineering Design: A Systematic Approach . London: Design Council.