Among the many changes required in implementing a just-in-time (JIT) production system, the change from batch to level production was the most difficult part in a consumer electronics company in Korea Simulation was used to persuade workers of the importance of level production by comparing the performance of batch production to level production. This article describes how simulation was used to convince workers to change and later to show them the improvements resulting from that change.
FACTOR Basic Modeling Reference. (1992). West Lafayette, IN: Pritsker Corporation.
2.
Golhar, D. Y
, & Stamm, C. L. (1991). The just-in-time philosophy: A literature review. International Journal of Production Research, 29, 657-676.
3.
Hall, R. W.
(1984). Leveling the schedule. Zero Inventory Philosophy & Practices Seminar Proceedings. Falls Church, VA.
4.
Huang, P. Y.
, Rees, L. P., & Taylor, B. W. III. (1983). A simulation analysis of the Japanese just-in-time technique (with Kanban) for a multiline, multi-stage production system. Decision Sciences, 14, 326-343.
5.
Monden, Y.
(1983). Toyota production system: Practical approach to production management. Norcross, GA: Industrial Engineering and Management Press.
6.
Pritsker, A.A.B.
(1986). Introduction to simulation and SLAM. New York: Halsted.
7.
Wallace, T. F.
, & Dougherty, J. R. (Eds.). (1987). APICS dictionary. Falls Church, VA: APICS.