Abstract
The construction sector is among the fastest growing sectors in Malaysia; it consumes a vast amount of natural resources and produces a massive volume of construction and demolition waste. The waste is collected in a decentralised manner by sub-contracted companies. It is challenging to obtain reliable information on the amount of construction waste generated, because it is hard to determine its exact quantity and composition. Therefore, this study proposes a quantitative construction waste estimation model for residential buildings according to available data collected from the Construction Industry Development Board, Malaysia. In the development of this model, a theoretical investigation of the construction procedure and the construction waste generation process was conducted. The waste generated rate was determined as 25.79 kg m−2 for new residential constructions, which translates into about 553,406 t of anticipated waste annually.
Get full access to this article
View all access options for this article.
References
Supplementary Material
Please find the following supplemental material available below.
For Open Access articles published under a Creative Commons License, all supplemental material carries the same license as the article it is associated with.
For non-Open Access articles published, all supplemental material carries a non-exclusive license, and permission requests for re-use of supplemental material or any part of supplemental material shall be sent directly to the copyright owner as specified in the copyright notice associated with the article.
