CossyphasH. and StarkR. “Evaluation of an Experimental High Mount Illumination Technique For Expressway Interchanges,” Illuminating Engineering,Vol. 66, February 1971, pp. 84−86.
2.
State of Illinois, Department of Public Works and Buildings, Division of Highways, Electrical Bureau,Interim Report: Evaluation of HighMount Area Lighting at the 1−94 and 1−80 Expressway Interchange, Chicago, I11, April 1970.
3.
LeVereR. and MahlerE. “Uniformity of Illumination,” Illuminating Engineering,Vol. 65, April 1970, p. 211.
4.
FowleA. W. and KaercherR. L. “Effective Control of Glare,” Illuminating Engineering, May 1962, pp. 336−348.
5.
deBoerJ. B. and SchreuderD. A. “Glare as a Criterion for Quality in Street Lighting,” Transaction of the Illuminating Engineering Society (London), Vol. 32, No. 2, 1967, pp. 117−135.
6.
ForbesT. W.SnyderT. E., and PainR. F. “Traffic Sign Requirements,” Highway Research Record, Number 70. Night Visibility 1963 and 1964, Washington, D. C., 1965.p. 52.